Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2006 | ENGINEERING - FINAL | Approved | ||
| 03/13/2006 | ENGINEERING - FINAL | Denied | 1. COMPLETE STRIPING ON NW AND NE CORNERS OF SITE. 2. PROVIDE A DEFINED DRAINAGE SWALE TO CONVEY STORMWATER FROM THE EAST SIDE OF THE BUILDING TO THE R/D BASIN. 3. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. |
|
| 03/09/2006 | ENGINEERING - FINAL | Denied | NOT READY SEE PREVIOUS COMMENTS | |
| 02/27/2006 | ENGINEERING - FINAL | Denied | 1. COMPLETE SIDEWALK AND R/D BASIN WEIR OUTLET AT THE SOUTHWEST CORNER OF THE SITE. 2. PROVIDE BICYCLE PARKING. 3. COMPLETE HANDICAP RAMP AND STRIPING AT NW CORNER OF SITE. 4. PROVIDE A CERTIFIED LETTER FROM THE ENGINEER THAT STATES THAT THE R/D BASIN IS CONSTRUCTED IN SUBSTANTIAL CONFORMANCE WITH THE PLAN AND WILL FUNCTION AS DESIGNED. |