Permit: T04CM04415
Permit Details
Apply Date:
04/28/2006
Applicant:
Description:
OFFICE:STORAGE:NEW
Permit Reviews
Permit Number - T04CM04415
Permit Status: Complete
Permit Description: OFFICE:STORAGE:NEW
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/22/2008 | RESUBMITTAL - SITE | 02/14/2008 | COMPLETED |
| 01/22/2008 | RESUBMITTAL | 02/14/2008 | COMPLETED |
| 03/07/2006 | RESUBMITTAL | 04/28/2006 | COMPLETED |
| 03/07/2006 | RESUBMITTAL - SITE ALL | 04/28/2006 | COMPLETED |
| 03/11/2005 | SITE | 04/15/2005 | COMPLETED |
| 03/11/2005 | COMMERCIAL NEW | 04/15/2005 | COMPLETED |
| 03/27/2007 | RESUBMITTAL | 05/07/2007 | COMPLETED |
| 03/27/2007 | RESUBMITTAL - SITE | 05/07/2007 | COMPLETED |
| 07/21/2014 | REVISION - - 1ST | 03/10/2016 | COMPLETED |
| 07/26/2007 | RESUBMITTAL - SITE ALL | 09/04/2007 | COMPLETED |
| 07/27/2007 | RESUBMITTAL | 09/04/2007 | COMPLETED |
| 10/04/2004 | PLANS OK TO SUBMIT - COMM | 03/11/2005 | COMPLETED |
| 10/04/2004 | PLANS OK TO SUBMIT - SITE | 12/03/2004 | COMPLETED |
| 10/13/2006 | RESUBMITTAL | 12/29/2006 | COMPLETED |
| 10/13/2006 | RESUBMITTAL - SITE ALL | 12/29/2006 | COMPLETED |
| 11/01/2006 | OTHER | 11/01/2006 | COMPLETED |
| 12/13/2007 | RESUBMITTAL | 01/10/2008 | COMPLETED |
| 12/14/2007 | RESUBMITTAL - SITE | 01/10/2008 | COMPLETED |
| 12/06/2022 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/03/2023 | APPROVED |
Conditions
Permit Number - T04CM04415
Permit Status: Complete
Permit Description: OFFICE:STORAGE:NEW
| Date | Description | Comments |
|---|---|---|
| 10/04/2004 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 04/13/2005 | SHOP DRAWINGS REQUIRED FOR TJI 's With review and approval stamp by project engineer. | |
| 01/22/2008 | SPECIAL INSPECTION IS REQUIRED FOR EXISTING MASONRY WALL AND FOOTING PER IBC 2006. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T04CM04415
Permite Description: OFFICE:STORAGE:NEW
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | {Activity date: 09/14/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ CONTRACTOR WILL RESCHEDULE.} |
| 10/26/2022 | COT - LCBU - Building Above Ceiling | N/A | Not Ready | |
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Electrical Underground | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Plumbing Progress | N/A | Not Ready | |
| 10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
| 10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Temporary Service | N/A | Not Ready | |
| 10/26/2022 | COT - LCPL - Rough Soil | N/A | Not Ready | |
| 10/26/2022 | COT - LCEL - Electrical Above Ceiling | N/A | Not Ready | |
| 10/26/2022 | COT - LCBU - Building Progress | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T04CM04415
Permit Description: OFFICE:STORAGE:NEW
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2008 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 03/13/2008; Status: Approved; Inspector: RJIROUDE; Comment: Entered by RJIROUDE - IVRS - Inspection :*} | |
| 03/28/2008 | COT - LCBU - Stem Wall/Retaining Wall | Passed | {Activity date: 03/28/2008; Status: Approved; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :*} ; {Activity date: 03/27/2008; Status: Denied; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection : See detailed listing on site.| 999* BOND BEAM VERTICALS NEED TO BE 2" FROM TOP OF BOND BEAM AND AT LEAST 1" SEPARATION BETWEEN THEM} |
|
| 05/02/2008 | BULD - Electrical Clearance | Passed | {Activity date: 05/02/2008; Status: Approved; Inspector: JWEATHER; Comment: Entered by JWEATHE1 - TEC CLEARED PER D. SANTACRUZ} | |
| 08/20/2008 | COT - LCBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/20/2008; Status: Approved; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* RECEIVED SPECIAL INSPECTION FOR EXISTING WALL} ; {Activity date: 03/13/2008; Status: Partial Approval; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* N,S,E FOOTINGS TO PLAN OK TO POUR FOOTING NEEDS DOOR JAMB AND CORNER VERT REBAR NEEDS SPECIAL INSPECTION FOR EXISTING CMU WALL FOOTING W.SIDE AND BOND BEAMS} |
|
| 08/20/2008 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 08/20/2008; Status: Approved; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* OK TO TOP OUT} ; {Activity date: 08/14/2008; Status: Partial Approval; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* OK TO GROUT W & NORTH WALLS TO 12'4" LOWER BOND BEAM IN PLACE} ; {Activity date: 08/01/2008; Status: Partial Approval; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* EAST WALL OK TO TOPOUT} ; {Activity date: 07/31/2008; Status: Not ready for Inspection; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :*} ; {Activity date: 07/21/2008; Status: Partial Approval; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* S.WALL TO 19.5 OK TO TOP OUT BOND BEAM IN PLACE NEED RFI TO REPLACE LEDGER S-2 WITH JOIST STILL NEED SPECIAL INSPECTION FOR PRE-EXISTING FOOTING} ; {Activity date: 07/17/2008; Status: Partial Approval; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* E.WALL TO 13'6" DOUBLE BOND BEAM IN PLACE SW TO 12' BOND BEAM IN PLACE} ; {Activity date: 07/09/2008; Status: Partial Approval; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* 2ND LIFT, ADD MISSING CORNER BAR} ; {Activity date: 05/21/2008; Status: Partial Approval; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :* 1. PARTIAL OK TO GROUT 1ST LIFT REPAIR NORTH WALL 2. NEED SPECIFIC SPECIAL INSPECTION FOR PRE-EXISTING WALL AND FOOTING} |
|
| 09/05/2008 | COT - LCBU - Roof Nailing | Passed | {Activity date: 09/05/2008; Status: Approved; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection :*} ; {Activity date: 09/04/2008; Status: Denied; Inspector: MHENSON; Comment: Entered by MHENSON - IVRS - Inspection : See detailed listing on site.| 999* 1. PER PLAN SHEATHING TO BE NAILED (STAPLES USED) 2. NEEDS ANCHOR BOLTS ON SOUTH JOIST 3. LADDER NEEDS TO BE TIED OFF!} |
|
| 02/22/2012 | COT - LCBU - Preslab | Passed | {Activity date: 02/22/2012; Status: Approved; Inspector: AQUIROZ; Comment: Entered by AQUIROZ - IVRS - Inspection :*} ; {Activity date: 08/23/2011; Status: Denied; Inspector: GDABBS; Comment: Entered by GDABBS - IVRS - Inspection : See detailed listing on site.| 999* NO ACCESS GATE LOCKED} ; {Activity date: 08/26/2010; Status: Partial Approval; Inspector: GDABBS; Comment: Entered by GDABBS - IVRS - Inspection :* 1) WEST HALF OF BLDG ONLY-OK 2) NOTE: MUST HAVE #03015 PLUMBING PRE-SLAB APPROVAL BEFORE POUR } |
|
| 08/12/2013 | COT - LCBU - Framing | Passed | {Activity date: 08/12/2013; Status: Approved; Inspector: MRAMBER; Comment: Entered by MRAMBER - IVRS - Inspection :*} ; {Activity date: 02/14/2013; Status: Denied; Inspector: MRAMBER; Comment: Entered by MRAMBER - IVRS - Inspection : See detailed listing on site.| 999*NO ONE ON SITE, GATES LOCKED} ; {Activity date: 08/17/2012; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JBURGE - INFORMATION ONLY, KEEP PERMIT ACTIVE} |
|
| 02/13/2014 | COT - LCME - Mechanical Intermediate | Passed | {Activity date: 02/13/2014; Status: Approved; Inspector: MRAMBER; Comment: Entered by MRAMBER - IVRS - Inspection :*} ; {Activity date: 02/10/2014; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by CSHARRA1 - 1. NO ADDRESS POSTED. PROVIDE PROPER ADDRESSING PRIOR TO NEXT INSPECTION OR A RE-FEE WILL BE ATTACHED 2. WORK NOT COMPLETE} ; {Activity date: 02/10/2014; Status: Not ready for Inspection; Inspector: MRAMBER; Comment: Entered by MRAMBER - IVRS - Inspection :*} |
|
| 07/28/2014 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 07/28/2014; Status: Approved; Inspector: DSANTACR; Comment: Entered by DSANTACR - IVRS - Inspection :*} ; {Activity date: 06/05/2014; Status: Denied; Inspector: DSANTACR; Comment: Entered by CSHARRA1 - ELECTRICAL FEEDER CONDUIT/SUBPANEL NOT PER PLAN} ; {Activity date: 06/05/2014; Status: Denied; Inspector: DSANTACR; Comment: Entered by DSANTACR - IVRS - Inspection : See detailed listing on site.| 999*} ; {Activity date: 05/30/2014; Status: Not ready for Inspection; Inspector: RCANCINO; Comment: Entered by RCANCIN1 - NO ACCESS TO PROPERTY CALLED 631-7695 NO ANSWER ON SITE AT 0825} |
|
| 09/19/2014 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 09/19/2014; Status: Approved; Inspector: DSANTACR; Comment: Entered by DSANTACR - IVRS - Inspection :*} | |
| 09/14/2022 | COT - LCBU - Building Final | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/29/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - - Partial, building inspection approved, pending final reports and special inspections, Fire and civil} | |
| 09/14/2022 | COT - LCEL - Electrical Final | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 03/10/2022; Status: Partial Approval; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - PA} ; {Activity date: 03/09/2022; Status: Correction Required; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - CO 1. Electrican required on site during inspection to open panels 2. Level area in front of main panel 3. Label all breakers in main panel and sub panel 4. No history of electric above-ceiling inspection and hard lid installed } ; {Activity date: 03/09/2022; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - RI canceled} ; {Activity date: 09/15/2015; Status: Denied; Inspector: MRAMBER; Comment: Entered by MRAMBER - IVRS - Inspection : A reinspection fee has been assessed for this inspection. Multiple inspectio} ; {Activity date: 03/18/2015; Status: Denied; Inspector: MRAMBER; Comment: Entered by MRAMBER - IVRS - Inspection : See detailed listing on site.| 999*} |
|
| 09/14/2022 | COT - LCPL - Yard Water Line | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/02/2008; Status: Partial Approval; Inspector: RLEDONNE; Comment: Entered by RLEDONNE - IVRS - Inspection :* 1. TRACER WIRE OK 2. COMPLETE AND CALL BACK FOR FINAL} ; {Activity date: 05/01/2008; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONNE - IVRS - Inspection :* 1. PROVIDE TRACER WIRE ON ALL UNDERGROUND YARD WATER PIPING OUTSIDE OF BUILDING, BLUE #18 THAT IS PVC 2. PSI TEST FROM METER TO 5' FROM BUILDING OK 3. PROVIDE BACKFLOW 4. CALL BACK FOR INSPECTION WHEN TRACER WIRE IS INSTALLED} |
|
| 09/14/2022 | COT - LCPL - Sewer | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} | |
| 09/14/2022 | COT - LCPL - Plumbing Final | Passed | {Activity date: 09/14/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved} | |
| 10/26/2022 | COT - FCON - Fire - Final | Passed | ||
| 11/10/2022 | COT - LCBU - Building Above Ceiling | Passed | ||
| 11/10/2022 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 11/10/2022 | COT - LCEL - Electrical Underground | Passed | ||
| 11/10/2022 | COT - LCPL - Plumbing Progress | Passed | ||
| 11/10/2022 | COT - LCME - Mechanical Final | Passed | ||
| 11/10/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 11/10/2022 | COT - LCEL - Temporary Service | Passed | ||
| 11/10/2022 | COT - LCPL - Rough Soil | Passed | ||
| 11/10/2022 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 11/10/2022 | COT - LCBU - Building Progress | Passed |