Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T04CM04415
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/10/2007 | HEATHER THRALL | ZONING | REVIEW | Denied | The building plans have conflicting measurements on the heights on different sides - and the site plan has not been approved yet. |
| 04/10/2007 | LINHART PETERSEN POERS ASSOC. | 2ND PARTY REVIEW | REVIEW | Approved | |
| 04/10/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide information on the sequence of operation for the restroom exhaust to show that recirculation of the air from the restroom will not occur. Reference Section 403.2.1, IMC 2000. |
| 04/12/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Second request. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2003, as amended by the City of Tucson, for business occupancy. (e.g. a drinking fountain) 2. Second request. Include the size of the building water supply pipe on the site plan. Reference Section 103.2.3, UPC 1994. 3. Provide a manufacturer's cut sheet for the water heater. The model specified is not included in the on-line catalog of Rheem products. Reference Section 103.2.3, UPC 1994. 4. Show how the location of the water heater is able to provide vertical clearance for handicapped access to the shower. (Detail 1/P1 calls for the support frame to have an upper surface at 8'-6", which only allows for 18" clear from the frame to the ceiling.) Reference Section 103.2.3, UPC 1994. |
| 04/12/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Demonstrate that exterior lighting fixtures are in compliance with 2003 IECC. REFER TO FIRST AND SECOND REVIEWS, AND THE COMcheck SUBMITTED, Section 3, #2. UNRESPONSIVE. Incandescent do not meet criteria of efficiency greater than 45 lumens/W 2. Demonstrate that exterior lighting fixtures are in compliance with the Outdoor Lighting Ordinance. REFER TO FIRST AND SECOND REVIEWS. These fixtures are referred to as Unshielded on the Outdoor Lighting Code Compliance calculations, and as Shielded on the Luminaire Schedule. It is not obvious from the cut sheet whether the fixture has FCO lighting distribution, but "UNSHIELDED" has been inked in. 3. 6 KW Water Heater is 208V on the electrical plans, and 240V on the Plumbing Schedule. Please clarify. |
| 05/03/2007 | JASON GREEN | ENGINEERING | REVIEW | Denied | s |
| 05/03/2007 | JASON GREEN | ENGINEERING | REVIEW | Denied | Building Permit can not be approved prior to Site Plan approval. JG |