Permit: DP22-0214

Parcel: 14042025A


Addresses:

2717 E CORONA RD

Inspection Status: Passed

Inspection History: For trash and recycling enclosures

Date Description Inspector Results Comments
01/12/2026 For trash and recycling enclosures Passed
03/28/2025 For trash and recycling enclosures Not Ready
04/07/2025 For trash and recycling enclosures Partial Pass 04/07/25, 4 ramp walls on the west side passed and 5 light poles, 4 on the west and one on the south east corner.
04/15/2025 For trash and recycling enclosures Partial Pass In corners of enclosure wall 6"x 4" angle bracket not 9" on center from top per plan. It is located more than 9" from top. It is also not galvanized.
08/12/2025 For trash and recycling enclosures Not Ready 08/12/25, Rebar in enclosure is completed at 24" on center, TTSM calls for a 12" mat. Approach has no rebar, TTSM calls for a 12" on center mat. All concrete per the TTSM calls to be at 6" thickness. Here it is scheduled for 7" in approach and 5in the Enclosure. Min with 1/2" rebar has to be 6" per standard details on rebar. 3" between dirt and bottom of rebar and 2" above rebar.
08/14/2025 For trash and recycling enclosures Partial Pass 08/14/25, refuse enclosure interior slabs are good to pour all 4 enclosures.
09/11/2025 For trash and recycling enclosures Partial Pass 9/11/25
4 Refuse Enclosures. 6" curb at inside corner of Wall meeting the Floor running all 3 sides. #4 Bars are epoxied perpendicular to wall and floor w/ 1 #4 tied to them running through curb. Reinforcing is to plan.
While inspecting, I noticed one of the walls with the doorway was sagging due to the weight of the gate attached to it. The contractor told me the solution for this condition is to prop the gate back up and get everything plum then pour the reinforced curb.

We need an RFI response from the engineer stating that this fix is adequate to support the walls correctly.
I advise not pouring these curbs until the RFI response is completed
11/04/2025 For trash and recycling enclosures Not Ready 11/4/25 Doors do not function as designed in 3 of 4 Refuse enclosures. NE is functioning.