| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2026 | For trash and recycling enclosures | Passed | ||
| 03/28/2025 | For trash and recycling enclosures | Not Ready | ||
| 04/07/2025 | For trash and recycling enclosures | Partial Pass | 04/07/25, 4 ramp walls on the west side passed and 5 light poles, 4 on the west and one on the south east corner. | |
| 04/15/2025 | For trash and recycling enclosures | Partial Pass | In corners of enclosure wall 6"x 4" angle bracket not 9" on center from top per plan. It is located more than 9" from top. It is also not galvanized. | |
| 08/12/2025 | For trash and recycling enclosures | Not Ready | 08/12/25, Rebar in enclosure is completed at 24" on center, TTSM calls for a 12" mat. Approach has no rebar, TTSM calls for a 12" on center mat. All concrete per the TTSM calls to be at 6" thickness. Here it is scheduled for 7" in approach and 5in the Enclosure. Min with 1/2" rebar has to be 6" per standard details on rebar. 3" between dirt and bottom of rebar and 2" above rebar. | |
| 08/14/2025 | For trash and recycling enclosures | Partial Pass | 08/14/25, refuse enclosure interior slabs are good to pour all 4 enclosures. | |
| 09/11/2025 | For trash and recycling enclosures | Partial Pass | 9/11/25 4 Refuse Enclosures. 6" curb at inside corner of Wall meeting the Floor running all 3 sides. #4 Bars are epoxied perpendicular to wall and floor w/ 1 #4 tied to them running through curb. Reinforcing is to plan. While inspecting, I noticed one of the walls with the doorway was sagging due to the weight of the gate attached to it. The contractor told me the solution for this condition is to prop the gate back up and get everything plum then pour the reinforced curb. We need an RFI response from the engineer stating that this fix is adequate to support the walls correctly. I advise not pouring these curbs until the RFI response is completed |
|
| 11/04/2025 | For trash and recycling enclosures | Not Ready | 11/4/25 Doors do not function as designed in 3 of 4 Refuse enclosures. NE is functioning. |