Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2025 |
|
|
Partial Pass |
Okay to backfill |
| 09/15/2025 |
|
|
Partial Pass |
9/15/25, An as-built will be completed to cover the rings around all clean outs and manholes to be concrete rings instead of asphalt. 9" at the ring and 6" at the edge with 2 #4 rebar rings. |
| 12/19/2024 |
|
|
Partial Pass |
Pipe installed with correct bedding and backfill materials being used. |