Inspection History Details
Inspection Status: Partial Pass
Inspection History: SITE - Sign Footer/Setback/Excavation Layout/Rebar
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | ||
| 04/25/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | Light pole footer is correct except cage needs to be lifted up towards j bolt template to provide 3" at bottom of pole. Picture will be provided showing it lifted, then it will be ok to pour. | |
| 09/11/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Partial Pass | 9/11/25 Footer for monument sign Reinforcement and dimensions correct to plan G3.2 Setback dimensions correct for RFI 77 |
|
| 11/04/2025 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | Sign footer not built to approved plans. It is placed a few feet to the west because of a coms line conflict. It does comply otherwise. |