Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP20-0125
Permit Details
Apply Date:
06/11/2020
Applicant:
CHRIS HODGSON
Description:
Site/Grading/SWPPP / IID - Corbett Block, new entertainment and food service.
Permit Reviews
Permit Number - DP20-0125
Permit Status: Issued
Permit Description: Site/Grading/SWPPP / IID - Corbett Block, new entertainment and food service.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/06/2022 | REVISION - - 1ST | 03/18/2022 | COMPLETED |
03/16/2021 | DEV PKG - RESUBMITTAL | 04/23/2021 | COMPLETED |
05/12/2020 | DEV PKG - OK TO SUBMIT | 06/15/2020 | COMPLETED |
06/15/2020 | DEV PKG | 07/29/2020 | COMPLETED |
06/27/2022 | REVISION - - 1ST | 08/18/2022 | COMPLETED |
07/19/2021 | DEV PKG - RESUBMITTAL | 07/27/2021 | COMPLETED |
11/18/2020 | DEV PKG - RESUBMITTAL | 01/26/2021 | COMPLETED |
12/24/2021 | DEV PKG - OK TO SUBMIT | 01/06/2022 | COMPLETED |
04/17/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 06/30/2023 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0125
Permite Description: Site/Grading/SWPPP / IID - Corbett Block, new entertainment and food service.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/16/2022 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | {Activity date: 09/16/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Track out Protection installed} ; {Activity date: 02/01/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. SWPPP, NOI , posted at East site entrance. } ; {Activity date: 10/27/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Installation of waddle } ; {Activity date: 10/19/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - . Continued. Waddle installed along east site perimeter. Large material piles and debris on site. 320 N 6th Ave, } ; {Activity date: 08/19/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - . Partially approved. Track out protection and Waddell} ; {Activity date: 08/10/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Not ready. Waddle on site, however not installed. Filter fabric laid on the ground at east entrance and needs to be installed a lower elevation to allow for a thicker patch of track out protection rock. } ; {Activity date: 08/06/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150, 09152, 09154. Continued} |
10/04/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 10/04/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued.} ; {Activity date: 09/29/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Minor track out noted after last rain event. 320 N 6th Ave,} ; {Activity date: 09/16/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. No issues or concerns at this time. This was a courtesy unscheduled inspection. Please schedule inspections biweekly as requested } ; {Activity date: 08/10/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Minor track out noted} ; {Activity date: 06/23/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - continued 320 N 6th Ave,} ; {Activity date: 06/15/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 06/09/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued 320 N 6th Ave} ; {Activity date: 05/24/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued 320 N 6th Ave,} ; {Activity date: 05/11/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 04/26/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued 320 N 6th Ave} ; {Activity date: 04/21/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues at this time. 320 N 6th Ave} ; {Activity date: 04/01/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 03/30/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 03/17/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued 320N N 6th Ave,} ; {Activity date: 03/02/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 02/25/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues or concerns at this time 320 N 6th Ave} ; {Activity date: 12/09/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. Kevin with Magnum and Craig with division two. I’m sure no offsite discharge occurs and is responsible to remove any offsite discharge as needed.} ; {Activity date: 10/13/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Large material and debris piles on site. 320N N 6th Ave,} ; {Activity date: 10/08/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - 09154. Continued } ; {Activity date: 08/31/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued} ; {Activity date: 08/10/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Continued. No issues at this time. Installation of controls in progress. Demolition in progress } ; {Activity date: 08/06/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150, 09152, 09154. Continued} |
08/23/2023 | SITE - Stormwater Final Inspection | N/A | Not Ready | construction fencing still surrounds site and construction debris in parking lot |
08/24/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | solid waste container still present, scheduled removal august 25 am, per job supervisor Josh with Sundt |
08/23/2023 | ENGR Engineering Final | N/A | Not Ready | construction fencing still surrounds site and construction debris in parking lot |
08/24/2023 | COT - ENGR - Signage Final | N/A | Partial Pass | solid waste container still present, scheduled removal august 25 am, per job supervisor Josh with Sundt |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0125
Permit Description: Site/Grading/SWPPP / IID - Corbett Block, new entertainment and food service.
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/09/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 12/09/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Approved. Greg Anderson with Division II phone number 240-0544 Kevin with Magnum number 704-0274 Please schedule Stormwater follow up inspections on a biweekly basis. Please schedule intermediate inspections anytime dirt is moved for utilities or any reason. Schedule intermediate and rebar inspections for trashenclosure , seven football is required Rebar required center. Photo documentation May be acceptable. } ; {Activity date: 08/06/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150, 09152, 09154. Continued} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - Partially approved. Rick with division 2. Magnum paving on site however no supervision. Installing site entrance on East side 5th Street. Will re-schedule inspection once signage and Stormwater protections are in place} |
|
04/28/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
07/10/2023 | ENGR Grading Final | Passed | ||
08/25/2023 | SITE - Stormwater Final Inspection | Passed | ||
08/31/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
08/31/2023 | ENGR Engineering Final | Passed |