Inspection Status: Not Ready
Inspection History: PDSD Site/Engineering Division - Landscaping
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
|
| 10/27/2022 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
|
| 10/18/2022 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Irrigation
320 N 6th Ave |
| 07/26/2022 |
PDSD Site/Engineering Division - Landscaping |
BBENEDON |
Not ready for Inspection |
Entered by NGARCIA3 - Not ready
320 N 6th Ave, |
| 07/03/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
No one on site at this time site is locked. Inspection will be rescheduled at a later date. |
| 07/03/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
No one outside at this time inspection rescheduled for a later date |
| 07/10/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
Contractor needs to replace some of the trees that were installed because they’re dead and some fencing in the front area and in the back area. And take a good look at the handicap parking area. |
| 07/10/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Not Ready |
Contractor needs to replace the trees that are dead, and some fencing on the south end and on the north end |
| 08/21/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
Complete all work on the Approved Plans prior to rescheduling this Inspection |
| 08/21/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
Complete all work on the Approved Plans prior to rescheduling this Inspection |
| 08/24/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
solid waste container still present, scheduled removal august 25 am, per job supervisor Josh with Sundt |
| 08/24/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Partial Pass |
solid waste container still present, scheduled removal august 25 am, per job supervisor Josh with Sundt |
| 08/31/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Passed |
|
| 08/31/2023 |
PDSD Site/Engineering Division - Landscaping |
|
Passed |
|