Permit: DP20-0125

Parcel: 11705069E


Addresses:

340 N 6TH AV


Inspection Status: Not Ready

Inspection History: PDSD Site/Engineering Division - Landscaping

Permit Number - DP20-0125

Inspection Description - PDSD Site/Engineering Division - Landscaping

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping Not Ready
10/27/2022 PDSD Site/Engineering Division - Landscaping Not Ready
10/18/2022 PDSD Site/Engineering Division - Landscaping BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Irrigation 320 N 6th Ave
07/26/2022 PDSD Site/Engineering Division - Landscaping BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready 320 N 6th Ave,
07/03/2023 PDSD Site/Engineering Division - Landscaping Not Ready No one on site at this time site is locked. Inspection will be rescheduled at a later date.
07/03/2023 PDSD Site/Engineering Division - Landscaping Not Ready No one outside at this time inspection rescheduled for a later date
07/10/2023 PDSD Site/Engineering Division - Landscaping Not Ready Contractor needs to replace some of the trees that were installed because they’re dead and some fencing in the front area and in the back area. And take a good look at the handicap parking area.
07/10/2023 PDSD Site/Engineering Division - Landscaping Not Ready Contractor needs to replace the trees that are dead, and some fencing on the south end and on the north end
08/21/2023 PDSD Site/Engineering Division - Landscaping Partial Pass Complete all work on the Approved Plans prior to rescheduling this Inspection
08/21/2023 PDSD Site/Engineering Division - Landscaping Partial Pass Complete all work on the Approved Plans prior to rescheduling this Inspection
08/24/2023 PDSD Site/Engineering Division - Landscaping Partial Pass solid waste container still present, scheduled removal august 25 am, per job supervisor Josh with Sundt
08/24/2023 PDSD Site/Engineering Division - Landscaping Partial Pass solid waste container still present, scheduled removal august 25 am, per job supervisor Josh with Sundt
08/31/2023 PDSD Site/Engineering Division - Landscaping Passed
08/31/2023 PDSD Site/Engineering Division - Landscaping Passed