| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 10/27/2022 |
ENGR Grading Final |
|
Not Ready |
|
| 03/03/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - Partially approved. Trash enclosure has been completed including slab and bollards
320N N 6th Ave |
| 02/24/2022 |
ENGR Grading Final |
BBENEDON |
Not ready for Inspection |
Entered by VVERA1 - Not ready. Photo documentation will be accepted for rebar inspection. Verticals required to be 32 inches on center. |
| 12/16/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by VVERA1 - partially approved trash enclosure footings |
| 12/16/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Trash enclosure requirements provided to contractor |
| 07/06/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Progress has stalled. No activity on site at this time. Barricades and fencing remain in place. |
| 09/29/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Courtesy unscheduled inspection. Division II please schedule inspections as required. Final grading in progress. Work within the right of way in progress. Barricades in place
320 N 6th Ave, |
| 08/12/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continue. Curb and light pole installations. Grading. Material piles throughout the site. |
| 07/20/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Installation of curbs in progress |
| 07/12/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Curb installations. Surveyors on site
320N N 6th Ave |
| 06/15/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued |
| 06/02/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continue. No activities onsite at this time
320 N 6th Ave, |
| 05/26/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - continued no activity at this time, baricades an temporary fencing remaining |
| 05/19/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. No activity on site at this time. Material and debris piles throughout site.
320N N 6th Ave |
| 05/03/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Electrical utility work
320 N 6th Ave |
| 04/29/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued |
| 04/21/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continue. Storm water work within public right of way requires department of transportation inspection. Schedule piping inspections within property boundaries and your development package permit
320 N 6th Ave |
| 04/19/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continue. Work within the right of way requires right of way Inspection from Department of transportation. Note right of way is barricaded from public. |
| 04/08/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Curbs
320N N 6th Ave |
| 04/06/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continue. Work within the right of way
|
| 02/25/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Greg with division two. Information provided for trash enclosure requirements
320 N 6th Ave |
| 01/25/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Grading and building construction in progress |
| 01/12/2022 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued
320N N 6th Ave |
| 01/05/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by VVERA1 - Par bollards |
| 01/04/2022 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. Trash enclosure bollards are required to be 7 feet total length 4 feet above slab. Greg with division 2 |
| 12/14/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Grading and utility work |
| 12/09/2021 |
ENGR Grading Final |
BBENEDON |
Partial Approval |
Entered by RSALDAT1 - Partially approved. HDPE Stormwater Pipe. Provide documentation to substantiate change in material type. |
| 12/08/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Site extended to the east. |
| 11/24/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Site utility work in progress |
| 11/16/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued Site has been elevated to accommodate building construction. Unprotected dirt soil‘s and debris piles present. Some controls in place. Work with him right away. |
| 11/02/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continue. Division two and Magnum paving on site. Large material and debris piles. Building pad construction in progress
320 N 6th Ave
|
| 10/27/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Rough Grading
|
| 09/30/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Diversified installing building footings at this time
|
| 09/23/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by NGARCIA3 - Continued. Building footings in progress. Dirt piles on site
320 N 6th Ave |
| 09/16/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. |
| 09/14/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Little activity on site |
| 09/03/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Psych and building pads have been rough graded. Temporary fencing installed. Fencing installed within the public right of way, lane closures in place. |
| 09/01/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Utility work within city right away in progress. Lane closures and barricades in place. |
| 08/20/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Grading for building pads |
| 08/10/2021 |
ENGR Grading Final |
BBENEDON |
Continued |
Entered by RSALDAT1 - Continued. Demolition in progress. Large piles of debris on site. |
| 04/28/2023 |
ENGR Grading Final |
|
Not Ready |
Below grade stormwater piping and trash enclosure installed without engineering inspections. Contractor change during project. Provide engineer acceptance of all work installed without City of Tucson engineering inspections. |
| 04/28/2023 |
ENGR Grading Final |
|
Not Ready |
Below grade stormwater piping and trash enclosure installed without engineering inspections. Contractor change during project. Provide engineer acceptance of all work installed without City of Tucson engineering inspections. |
| 07/03/2023 |
ENGR Grading Final |
|
Not Ready |
No one on site at this time site is locked. This inspection will be rescheduled at a later date to verify all work that is completed. |
| 07/10/2023 |
ENGR Grading Final |
|
Passed |
|
| 07/10/2023 |
ENGR Grading Final |
|
Passed |
|