Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Final Inspection
Permit Number - DP20-0125
Inspection Description - SITE - Stormwater Final Inspection
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | SITE - Stormwater Final Inspection | Not Ready | ||
04/28/2023 | SITE - Stormwater Final Inspection | Not Ready | work in progress. Provide notice of termination for SWPPP permit, remove all temporary Stormwater controls and clean all debris from site including Stormwater catch basins. | |
07/10/2023 | SITE - Stormwater Final Inspection | Partial Pass | Contractor needs to submit the inspections for the storm drains by the engineer of record before we can finalize it | |
07/21/2023 | SITE - Stormwater Final Inspection | Not Ready | Provide notice of termination | |
07/25/2023 | SITE - Stormwater Final Inspection | Not Ready | final will require notice of termination from the ADEQ. | |
08/21/2023 | SITE - Stormwater Final Inspection | Partial Pass | Complete all work on the Approved Plans prior to rescheduling this Inspection Ok for Level 4 TCO for Occuoancy |
|
08/23/2023 | SITE - Stormwater Final Inspection | Not Ready | construction fencing still surrounds site and construction debris in parking lot | |
08/25/2023 | SITE - Stormwater Final Inspection | Passed |