Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Track out Protection installed |
| 02/01/2022 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. SWPPP, NOI , posted at East site entrance.
|
| 10/27/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by VVERA1 - Continued. Installation of waddle
|
| 10/19/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by NGARCIA3 - . Continued. Waddle installed along east site perimeter. Large material piles and debris on site.
320 N 6th Ave,
|
| 08/19/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Partial Approval |
Entered by NGARCIA3 - . Partially approved. Track out protection and Waddell |
| 08/10/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Not ready for Inspection |
Entered by RSALDAT1 - Not ready. Waddle on site, however not installed. Filter fabric laid on the ground at east entrance and needs to be installed a lower elevation to allow for a thicker patch of track out protection rock.
|
| 08/06/2021 |
SITE - Stormwater Setup and Controls |
BBENEDON |
Continued |
Entered by RSALDAT1 - 09150, 09152, 09154. Continued |