Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 14122004L
Parcel Search
Parcel Attributes
Annexations & Original City Zoning (OCZ)
Date - 11/25/2024 2 a.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 11/25/2024 2 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-00-23 | Rita 244 LLC - Rita Road | C-2 | Effectuated | 03/14/2006 | S RITA |
Special Development Requests & Requirements
Date - 11/25/2024 2 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
T09SA00059 | Efectuat | N/A | Variance request to reduce parking associated with a warehouse expansion |
Permits
Parcel Number - 14122004L
Date - 11/25/2024 2 a.m.
Total Number Of Permits - (33)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
D09-0001 | Approved | 01/23/2009 | N/A | Development Package | ARIZONA CANNING FACILITY EXPANSION | |
T21CM01497 | Expired | 02/19/2021 | 12/01/2021 | Commercial Building | Boiler Addition | |
TR-UTL-0523-01527 | Complete | 05/09/2023 | 06/29/2023 | Right-of-Way (ROW) - Utility | Cox to overlash 414' of existing CATV aerial strand, trench 25' & bore 135' to install new CATV conduit for system tie. | |
T21CM04898 | Expired | 06/11/2021 | 09/28/2022 | Commercial Building | any exInstallation of Hydro-sterilization unit in the existing facility. Structural work includes th | |
T21CM05762 | Needs resubmittal | 07/14/2021 | N/A | Commercial Building | Installation of chiller and cooling tower | |
T17FC00961 | Expired | 11/28/2017 | 08/15/2018 | Fire Construction Permit | Automatic Fire Extingshing Sys - INSTALL ESFR SYSTEM IN NEW COOLER FROM EXISTING WET PIPE FIRE SPRINKLER SYSTEM.; Commercial Fire Sprinkler Systems - Modification of heads: 36 | |
T06CM05386 | Final | 10/09/2006 | 02/13/2008 | COMBO | FOUNDATION ONLY FOR FUTURE HYDRO STAT | |
T06OT02042 | Withdrwn | 08/04/2006 | N/A | C-OF-O | C OF O: FACTORY/STORAGE | |
T06OT03017 | Final | 11/20/2006 | 09/18/2007 | SIGN | 12202 | |
T07BU00542 | Final | 03/09/2007 | 02/09/2008 | SPKLR | remove and replace sprinkler piping | |
T07BU00543 | Withdrwn | 03/09/2007 | N/A | SPKLR | remove and replace sprinkler piping | |
T07BU00628 | Final | 03/22/2007 | 02/09/2008 | BUILD | REPLACE FACP EQUIPMENT & RELATED DEVICES | |
T07BU02001 | Final | 09/20/2007 | 06/11/2008 | SPKLR | 24 new sprinkler heads | |
T07CM00211 | Final | 01/17/2007 | 02/12/2008 | COMBO | FOUNDATION ONLY - FOR STORK HYDRO EQUIPMENT IN EXISTING BLDG. | |
T07CM00373 | Final | 01/31/2007 | 02/12/2008 | COMBO | REMOVE ROOF TO MODIFY STORK HYDROSTAT & REATTACH ROOF | |
T09BU00107 | Withdrwn | 01/23/2009 | N/A | GRADSWPP | GRADING Arizona Canning Expansion | |
T09BU00652 | Final | 05/05/2009 | 02/14/2010 | SPKLR | Install 580' of 12" & 493' of 8" underground & 968 fire sprinklers | |
T09BU01097 | Final | 07/28/2009 | 02/13/2010 | BUILD | FIRE ALARM | |
T09BU01293 | Final | 08/28/2009 | 04/03/2010 | SPKLR | Install 39 fire sprinklers | |
T09CM00182 | Final | 01/23/2009 | 02/16/2010 | COMBO | ADDITION: "FINISH PRODUCT" STORAGE | |
T09CM00859 | Expired | 04/16/2009 | 11/11/2009 | COMBO | FOUNDATION ONLY | |
T15TC00115 | Expired | 01/12/2015 | N/A | BARRICAD | JOB WILL REQ'D TO DIG A PIT TO LOCATE EXISTING CONDUIT, TRENCH +/-6' TO PLACE (1) 4" CONDUIT TO A NEW 3048 HANDHOLE, THEN TRRENCH ANOTHER +/-6' TO EXTEND (1) 4" CONDUIT TO AN EXISTING PEDESTAL. WORK WILL TAKE PLACE APPRX +/-30' OFFSET FROM RITA RD END OF CURVE SEE ATTCHED DETAIL FOR LOCATION | |
T16RW01009 | Final | 08/12/2016 | 09/11/2016 | ROW | (2) 5x5 IN DIRT TO INSTALL ANODES ACROSS THE STREET FROM ADDRESS BY JULIAN WASH PASS | |
T18FC00647 | Final | 08/06/2018 | 12/01/2020 | FIRECONS | FIRE PANEL REPLACEMENT | |
T18RW02805 | Final | 06/20/2018 | 08/31/2018 | ROW | NEED (2) MH ACCESS FOR SPLICING ONLY MH # 24674 & 22824 | |
T19RW06193 | Final | 10/17/2019 | 10/22/2019 | ROW | Setting up a flagging operation near the railroad crossing for the railroad. The railroad signals will be shut off during working hours and flaggers will be placed at the crossing to act as a signal when trains and machines travel through the crossings. Traffic control will be set up per the TA-13 from the MUTCD. ADDRESS ON APPLICATION-8753 S RITA RD | |
T19RW06867 | Final | 11/07/2019 | 12/12/2019 | ROW | SETUP MIOVISION SCOUT MOUNTED ON A POLE FOR 48-HOUR VIDEO COLLECTION IN THE AREA OF RITA ROAD AND OLD VAIL ROAD NOTE: WORK IS IN THE AREA OF THE RAILROAD TRACKS - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY | |
T19RW07763 | Final | 12/30/2019 | 03/06/2020 | ROW | EXCAVATE / INSPECT AND REPAIR KINDER MORGAN'S PETROLEUM PIPELINE (JET FUEL) PER FEDERAL D.O.T REQUIREMENTS. | |
T20RW02638 | Final | 05/11/2020 | 06/27/2020 | ROW | PAVNG JULAIN WASH BIKE PATH, LANE CLOSURE FOR TRUCK ACCESS ****PERMIT FOR WORK WITHIN COT ROW ONLY**** ADDRESS CHANGED FROM "UPRR AT HOUGHTON & RITA ROAD" TO "8755 S RITA RD" ***CONTRACTOR MUST REACH OUT TO INSPECTOR FOR PRE-CON BEFOR ANY WORK CAN BE DONE*** | |
T21FC00643 | Final | 08/18/2021 | 07/20/2022 | FIRECONS | Modify existing wet pipe fire sprinkler system. | |
T21RW03645 | Final | 08/06/2021 | 10/13/2021 | ROW | UNION PACIFIC RAILROAD HAS A 6 HOUR REPAIR REQUIRING A FULL CLOSURE THEY INTEND TO DO TO THE RAILROAD TRACKS LOCATED ON RITA WAY SOUTH OF E OLD VAIL ROAD. | |
T21RW04647 | Withdrwn | 10/12/2021 | N/A | ROW | S.2878460-2- ALONG WEST SIDE OF S. RITA RD. ACCESS MH 22824 TO SPLICE EXISTING CABLE. | |
T22FC00049 | Final | 01/18/2022 | 01/21/2023 | FIRECONS | Install 3 new modules to monitor new sprinkler riser installed and permitted by Kazal Fire. |
Code Enforcement
Parcel Number - 14122004L
Date - 11/25/2024 2 a.m.
Total Number Of Code Cases - 4
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T07FR00173 | Complete | 01/19/2007 | N/A | FIREINSP | full inspection | |
T07FR00478 | Complete | 03/13/2007 | N/A | FIREINSP | AST Inspection | |
T09FR01399 | Complete | 04/23/2009 | N/A | FIREINSP | FIRE SPRINKLER SYSTEM COMPLAINT | |
T14DV01207 | Noverify | 03/03/2014 | N/A | DNR_VIOL | Rotting food odor |
Plans
Parcel Number - 14122004L
Date - 11/25/2024 2 a.m.
Total Number Of Plans - 4
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T06BA00005 | Approved | 01/04/2006 | N/A | Basin | ||
C9-00-23 | Effected | 03/14/2006 | N/A | REZONING PROCEDURES | Proposal for approximately 550,000 square-foot food and beverage plant on 85 acres and 795,000 square feet of industrial uses within a 99-acre employment campus, and 270,000 square feet of commercial uses on approximately 37 acres. RZ06-020: Proposal for approximately 550,000 square-foot food and beverage plant on 85 acres (northern parcel). RZ06-022: C-2 zoning for 270,000 square feet of commercial uses on approximately 37 acres. RZ06-024: Time extension for C-2 zoning for 270,000 square feet of commercial uses on approximately 37 acres. RZ07-025: Development Plan for I-1 zoning for a 1,179,250 square foot, one-story distribution center in lieu of the previously approved 795,000 square foot employment campus on 99.0 acres (southeast portion). | |
T09PRE0002 | Applied | 01/20/2009 | N/A | NEIGHBORHOOD NOTIFICATION | ||
T21PRE0102 | Closed | 04/22/2021 | N/A | NEIGHBORHOOD NOTIFICATION | Site: Faribault. |