Permit Details

Status:
Inspections
Type:
Commercial Building
Address NEW:
8755 S RITA RD BLDG 2
Apply Date:
05/22/2026
Applicant:
Charlie Smith
Description:
Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT: “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. THIS PERMIT: Permit #2 broken into Phase 1” (******THIS PERMIT******) foundation/slab design to expedite review of concrete work. Permit #2 Phase 2 (SEE SEPARATE PERMIT) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines.

Permit Reviews

Permit Number - TC-COM-0526-00763
Permit Status: Inspections
Permit Description: Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT: “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. THIS PERMIT: Permit #2 broken into Phase 1” (******THIS PERMIT******) foundation/slab design to expedite review of concrete work. Permit #2 Phase 2 (SEE SEPARATE PERMIT) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines.
Start Date Submittal Complete Date Status  
05/27/2026 COMMERCIAL REVIEW - FULL v.1 06/11/2026 REQUIRES RESUBMIT Review Details
06/11/2026 COMMERCIAL REVIEW - FULL v.2 06/17/2026 REQUIRES RESUBMIT Review Details
07/02/2026 COMMERCIAL REVIEW - FULL v.3 07/27/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0526-00763
Permit Status: Inspections
Permit Description: Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT: “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. THIS PERMIT: Permit #2 broken into Phase 1” (******THIS PERMIT******) foundation/slab design to expedite review of concrete work. Permit #2 Phase 2 (SEE SEPARATE PERMIT) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines.
Date Description Comments
05/27/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/27/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0526-00763
Permite Description: Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT: “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, sludge storage tanks, underground piping. Structural foundation/slab design. Special Inspections Certificate form be submitted prior to Start of Inspections as deferred submittal. 2. THIS PERMIT: Permit #2 broken into Phase 1” (******THIS PERMIT******) foundation/slab design to expedite review of concrete work. Permit #2 Phase 2 (SEE SEPARATE PERMIT) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/06/2026 COT - LCPL - Sewer N/A Partial Pass Partial pass, saddle tap to main sewer.
09/17/2026 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass 9/17/26: excavation/reinforcement footers at stem wall building verified per F8, F6, F7, F4, F9X2, F5. Canopy building excavation /reinforcement on exterior columns verified per F3, F1X2, F2. Okay for concrete placement at progress areas.