Plan Details

Status:
Complete
Type:
Modifications to Zoning Approvals
Address:
8755 S RITA RD

Apply Date:
04/23/2026
Applicant:
Scott
Description:
This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.
Architects:
  • G3 Water Engineers
  • G3 Water Engineers, LLC
  • Tucson Airport Authority
Contractors:

Plan Reviews

Plan Number - TP-MOD-0426-000044
Plan Status: Complete
Plan Description: This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.
Start Date Submittal Complete Date Status  
05/20/2026 Zoning Permit Review v.1 APPROVED Review Details
04/28/2026 Pre-Application Conference Review v.1 APPROVED Review Details