Permit: TC-COM-0626-00868
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
8755 S RITA RD BLDG 2
Address NEW:
8755 S RITA RD BLDG 2
Apply Date:
06/11/2026
Applicant:
Charlie Smith
Description:
TP-PRE-1125-00238, TD-DEV-0126-00008 Wastewater pretreatment expansion: 1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab. Split Commercial New Building application into (2) permits: 1. SEE SEPARATE PERMIT “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, and sludge storage tanks, and associated underground piping TC-COM-0526-00737. 2. Permit #2 broken into “Phase 1” (Permit #2 Phase #1 SEE SEPARATE PERMIT TC-COM-0526-00763) foundation/slab design, associated piping to expedite review of concrete work. Permit #2 Phase 2 (******THIS PERMIT******) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines, site civil, demolition, structural anchorage, electrical, HVAC, plumbing drawings & calculations.
Permit Reviews
Permit Number - TC-COM-0626-00868
Permit Status: In review
Permit Description: TP-PRE-1125-00238, TD-DEV-0126-00008
Wastewater pretreatment expansion:
1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab.
Split Commercial New Building application into (2) permits:
1. SEE SEPARATE PERMIT “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, and sludge storage tanks, and associated underground piping TC-COM-0526-00737.
2. Permit #2 broken into “Phase 1” (Permit #2 Phase #1 SEE SEPARATE PERMIT TC-COM-0526-00763) foundation/slab design, associated piping to expedite review of concrete work. Permit #2 Phase 2 (******THIS PERMIT******) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines, site civil, demolition, structural anchorage, electrical, HVAC, plumbing drawings & calculations.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/16/2026 | COMMERCIAL REVIEW - FULL v.1 | 07/09/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0626-00868
Permit Status: In review
Permit Description: TP-PRE-1125-00238, TD-DEV-0126-00008
Wastewater pretreatment expansion:
1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab.
Split Commercial New Building application into (2) permits:
1. SEE SEPARATE PERMIT “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, and sludge storage tanks, and associated underground piping TC-COM-0526-00737.
2. Permit #2 broken into “Phase 1” (Permit #2 Phase #1 SEE SEPARATE PERMIT TC-COM-0526-00763) foundation/slab design, associated piping to expedite review of concrete work. Permit #2 Phase 2 (******THIS PERMIT******) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines, site civil, demolition, structural anchorage, electrical, HVAC, plumbing drawings & calculations.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 06/16/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 07/08/2026 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 07/08/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/08/2026 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 07/08/2026 | Post-Installed Anchor Inspection Report is required. |
| 07/08/2026 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 07/08/2026 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 07/08/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
| 07/09/2026 | Stair Designs must be submitted and approved prior to final inspection. |
Conditions
Permit Number - TC-COM-0626-00868
Permit Status: In review
Permit Description: TP-PRE-1125-00238, TD-DEV-0126-00008
Wastewater pretreatment expansion:
1. New concrete slab with canopy (sides are open air) covers wastewater process equipment. 2. New pre-engineered metal building to house electrical equipment, blowers, chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks wastewater equalization and biological treatment, two new closed-top FRP sludge storage tanks. 4. New cooling tower on 12’x12’ concrete slab.
Split Commercial New Building application into (2) permits:
1. SEE SEPARATE PERMIT “Permit #1” two bolted steel wastewater treatment tanks, cooling tower, and sludge storage tanks, and associated underground piping TC-COM-0526-00737.
2. Permit #2 broken into “Phase 1” (Permit #2 Phase #1 SEE SEPARATE PERMIT TC-COM-0526-00763) foundation/slab design, associated piping to expedite review of concrete work. Permit #2 Phase 2 (******THIS PERMIT******) above-grade building/canopy structure, equipment anchorage, electrical, heating/cooling, plumbing disciplines, site civil, demolition, structural anchorage, electrical, HVAC, plumbing drawings & calculations.
| Date | Description | Comments |
|---|---|---|
| 06/16/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |