Permit Details

Status:
Inspections
Type:
Development Package
Address:
8755 S RITA RD
Address NEW:
8755 S RITA RD
Apply Date:
01/09/2026
Applicant:
Charlie Smith
Description:
This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.

Permit Reviews

Permit Number - TD-DEV-0126-00008
Permit Status: Inspections
Permit Description: This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.
Start Date Submittal Complete Date Status  
05/14/2026 DEVELOPMENT PACKAGE NEW v.4 06/03/2026 APPROVED Review Details
01/12/2026 DEVELOPMENT PACKAGE NEW v.1 01/14/2026 REQUIRES RESUBMIT Review Details
03/04/2026 DEVELOPMENT PACKAGE NEW v.2 03/31/2026 REQUIRES RESUBMIT Review Details
04/20/2026 DEVELOPMENT PACKAGE NEW v.3 05/13/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0126-00008
Permit Status: Inspections
Permit Description: This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.
Total Outstanding Activity Conditions - 1
Date Name
07/07/2026 Prior to final: • Deferred Items: The following items are not required for initial DP approval but must be submitted under the Utility Permit as deferred submittals prior to final inspections: o Site electrical distribution o Site lighting systems

Conditions

Permit Number - TD-DEV-0126-00008
Permit Status: Inspections
Permit Description: This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.
Date Description Comments
06/03/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0126-00008
Permit Description: This Development Package submittal is a follow-up to the Pre-Application Conference review of the proposed wastewater pretreatment facility expansion at the Faribault Foods, Inc (Arizona Canning Company, LLC) site under Plan Number TP-PRE-1125-00238. The proposed construction will consist of: 1. A new concrete slab with a protective canopy of approximately 18’ interior eave height to cover the wastewater process equipment. The sides of the canopy will be open air. 2. A new pre-engineered metal building (PEMB) approximately 45’x38’ (1,710 square feet) to house electrical equipment, blowers, and chemical dosing equipment. 3. Two new bolted-steel, open-top, above grade tanks for wastewater equalization (47.5’ diameter and 32.5’ tall) and biological treatment (55.5’ diameter and 24.75’ tall), and two new closed-top FRP sludge storage tanks approximately 13’ diameter and 28’ tall. 4. A new cooling tower (18’ tall) installed on a 12’x12’ concrete slab.
Total Completed Inspections - 1
Date Description Inspector Results Comments
07/14/2026 PDSD Engineering Division Pre-Construction SITE Passed Discussed related permit status, and that piping inspection should be requested on the utility permit.