Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 8755 S RITA RD
Search
Parcel Attributes
Parcel | 14122004L 14122004H 141220050 141220060 141220070 141220080 141220090 141220100 141220110 141220120 141220130 141220140 141220150 141220160 |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | I-2 |
Water Course | Washes |
Airport Environs Zone | Tucson International AEZ Paddle ,NCD-A Davis Monthan AEZ Paddle |
Tucson Ward | Ward 4 |
Major Streets & Routes | Arterial or Collector |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Historic Records Requests
Address: 8755 S RITA RD
Date - 11/25/2024 1:24 a.m.
Total Number Of Historic Records Requests - (1)
Name | Action |
---|---|
Address: 8755 S RITA RD - Doc Type: CERT OF OCC |
Annexations & Original City Zoning (OCZ)
Address: 8755 S RITA RD
Date - 11/25/2024 1:24 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/25/2024 1:24 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-00-23 | Rita 244 LLC - Rita Road | C-2 | Effectuated | 03/14/2006 |
Special Development Requests & Requirements
Address: 8755 S RITA RD
Date - 11/25/2024 1:24 a.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T09SA00059 | EFECTUAT | 02/26/2009 | N/A | Board of Adjustment | Variance request to reduce parking associated with a warehouse expansion |
Permits
Address: 8755 S RITA RD
Date - 11/25/2024 1:24 a.m.
Total Number Of Permits - (56)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T17FC00961 | Expired | 11/28/2017 | 08/15/2018 | Fire Construction Permit | Automatic Fire Extingshing Sys - INSTALL ESFR SYSTEM IN NEW COOLER FROM EXISTING WET PIPE FIRE SPRINKLER SYSTEM.; Commercial Fire Sprinkler Systems - Modification of heads: 36 | |
T21CM05762 | Needs Resubmittal | 07/14/2021 | N/A | Commercial Building | Installation of chiller and cooling tower | |
T21CM04898 | Expired | 06/11/2021 | 09/28/2022 | Commercial Building | any exInstallation of Hydro-sterilization unit in the existing facility. Structural work includes th | |
TR-UTL-0523-01527 | Complete | 05/09/2023 | 06/29/2023 | Right-of-Way (ROW) - Utility | Cox to overlash 414' of existing CATV aerial strand, trench 25' & bore 135' to install new CATV conduit for system tie. | |
T21CM01497 | Expired | 02/19/2021 | 12/01/2021 | Commercial Building | Boiler Addition | |
D09-0001 | Approved | 01/23/2009 | N/A | Development Package | ARIZONA CANNING FACILITY EXPANSION | |
T00AN00771 | ISSUED | 09/27/2000 | N/A | ADDRNEW | ||
T00BU03389 | FINAL | 11/16/2000 | 02/03/2007 | GRADING | GRADING: 190000 CY CUT & 198000 CY FILL | |
T00BU03693 | FINAL | 12/22/2000 | 06/20/2001 | GRADING | GRUBBING | |
T00CM05956 | FINAL | 12/11/2000 | 02/03/2007 | COMBO | FOUNDATION ONLY | |
T00EL02922 | FINAL | 12/21/2000 | 09/12/2001 | ELECT | TEMP SERVICE | |
T01BU00953 | FINAL | 04/11/2001 | 06/05/2002 | TEMP-FBB | TEMP CONSTRUCTION TRAILER | |
T01BU01953 | FINAL | 07/06/2001 | 01/04/2003 | SPKLR | FIRE SPKR:INSTALL 1315LF OF 12" PIPE & 755LF OF 8" PIPE | |
T01BU03128 | FINAL | 11/01/2001 | 01/04/2003 | SPKLR | FIRE SPKR:ADD 4408 | |
T01BU03513 | FINAL | 12/14/2001 | 02/03/2007 | TEMP-FBB | TEMP FBB:CONSTRUCTION TRAILER | |
T01CM00484 | FINAL | 01/31/2001 | 03/10/2003 | COMBO | SHELL BLDG:SLIM FAST | |
T01CM02145 | C OF O | 05/04/2001 | 03/24/2003 | COMBO | NEW:FACTORY/STORAGE | |
T01CM03196 | C OF O | 06/27/2001 | 02/03/2007 | COMBO | TI:MANUFACTURING | |
T01CM05267 | WITHDRWN | 10/22/2001 | N/A | COMBO | MODULAR:CONSTRUCTION OFFICE | |
T01EX00413 | CLOSED | 04/05/2001 | 06/04/2001 | EXCAV | EXCAV:180LF SEWER LINE REPAIR | |
T02BU01098 | FINAL | 04/15/2002 | 01/04/2003 | SPKLR | FIRE SPRINKLER:ADD 36 | |
T02BU01670 | FINAL | 06/11/2002 | 01/04/2003 | SPKLR | FIRE SPKR:ADD 380 | |
T02BU01709 | FINAL | 06/13/2002 | 01/20/2003 | BUILD | INSTALL:STORAGE RACKS | |
T02BU01801 | FINAL | 06/21/2002 | 01/04/2003 | SPKLR | FIRE SPKR:ADD 27 | |
T02OT01711 | FINAL | 10/29/2002 | 07/09/2003 | SIGN | SIGN:ELECTRIC:4683 | |
T03BU01615 | WITHDRWN | 06/18/2003 | N/A | BUILD | INSTALL:PALLET RACKING | |
T03BU02788 | FINAL | 10/27/2003 | 05/17/2004 | BUILD | REPLACE:ROOF | |
T06CM05386 | FINAL | 10/09/2006 | 02/13/2008 | COMBO | FOUNDATION ONLY FOR FUTURE HYDRO STAT | |
T06OT02042 | WITHDRWN | 08/04/2006 | N/A | C-OF-O | C OF O: FACTORY/STORAGE | |
T06OT03017 | FINAL | 11/20/2006 | 09/18/2007 | SIGN | 12202 | |
T07BU00542 | FINAL | 03/09/2007 | 02/09/2008 | SPKLR | remove and replace sprinkler piping | |
T07BU00543 | WITHDRWN | 03/09/2007 | N/A | SPKLR | remove and replace sprinkler piping | |
T07BU00628 | FINAL | 03/22/2007 | 02/09/2008 | BUILD | REPLACE FACP EQUIPMENT & RELATED DEVICES | |
T07BU02001 | FINAL | 09/20/2007 | 06/11/2008 | SPKLR | 24 new sprinkler heads | |
T07CM00211 | FINAL | 01/17/2007 | 02/12/2008 | COMBO | FOUNDATION ONLY - FOR STORK HYDRO EQUIPMENT IN EXISTING BLDG. | |
T07CM00373 | FINAL | 01/31/2007 | 02/12/2008 | COMBO | REMOVE ROOF TO MODIFY STORK HYDROSTAT & REATTACH ROOF | |
T09BU00107 | WITHDRWN | 01/23/2009 | N/A | GRADSWPP | GRADING Arizona Canning Expansion | |
T09BU00652 | FINAL | 05/05/2009 | 02/14/2010 | SPKLR | Install 580' of 12" & 493' of 8" underground & 968 fire sprinklers | |
T09BU01097 | FINAL | 07/28/2009 | 02/13/2010 | BUILD | FIRE ALARM | |
T09BU01293 | FINAL | 08/28/2009 | 04/03/2010 | SPKLR | Install 39 fire sprinklers | |
T09CM00182 | FINAL | 01/23/2009 | 02/16/2010 | COMBO | ADDITION: "FINISH PRODUCT" STORAGE | |
T09CM00859 | EXPIRED | 04/16/2009 | 11/11/2009 | COMBO | FOUNDATION ONLY | |
T15TC00115 | EXPIRED | 01/12/2015 | N/A | BARRICAD | JOB WILL REQ'D TO DIG A PIT TO LOCATE EXISTING CONDUIT, TRENCH +/-6' TO PLACE (1) 4" CONDUIT TO A NEW 3048 HANDHOLE, THEN TRRENCH ANOTHER +/-6' TO EXTEND (1) 4" CONDUIT TO AN EXISTING PEDESTAL. WORK WILL TAKE PLACE APPRX +/-30' OFFSET FROM RITA RD END OF CURVE SEE ATTCHED DETAIL FOR LOCATION | |
T16RW01009 | FINAL | 08/12/2016 | 09/11/2016 | ROW | (2) 5x5 IN DIRT TO INSTALL ANODES ACROSS THE STREET FROM ADDRESS BY JULIAN WASH PASS | |
T16TC00516 | FINAL | 03/01/2016 | N/A | BARRICAD | CLOSURE OF MAIN RITA RD ENTRANCE TO UA SCIENCE PARK. WORK TO BE COMPLETED ON 4 SEPARATE SATURDAY MORNINGS STARTING 3/5/16. | |
T16TC01425 | EXPIRED | 06/09/2016 | N/A | BARRICAD | CLOSURE OF MAIN RITA RD ENTRANCE TO UA SCIENCE PARK FOR REPAIRS TO ELECTRONICS ON THE GUARD FACILITY. WORK TO START AT 6 AM ON SATURDAY 6/18/16 AND COMPLETED BY 7 PM ON THE SAME DAY. | |
T18FC00647 | FINAL | 08/06/2018 | 12/01/2020 | FIRECONS | FIRE PANEL REPLACEMENT | |
T18RW02805 | FINAL | 06/20/2018 | 08/31/2018 | ROW | NEED (2) MH ACCESS FOR SPLICING ONLY MH # 24674 & 22824 | |
T19RW06193 | FINAL | 10/17/2019 | 10/22/2019 | ROW | Setting up a flagging operation near the railroad crossing for the railroad. The railroad signals will be shut off during working hours and flaggers will be placed at the crossing to act as a signal when trains and machines travel through the crossings. Traffic control will be set up per the TA-13 from the MUTCD. ADDRESS ON APPLICATION-8753 S RITA RD | |
T19RW06867 | FINAL | 11/07/2019 | 12/12/2019 | ROW | SETUP MIOVISION SCOUT MOUNTED ON A POLE FOR 48-HOUR VIDEO COLLECTION IN THE AREA OF RITA ROAD AND OLD VAIL ROAD NOTE: WORK IS IN THE AREA OF THE RAILROAD TRACKS - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY | |
T19RW07763 | FINAL | 12/30/2019 | 03/06/2020 | ROW | EXCAVATE / INSPECT AND REPAIR KINDER MORGAN'S PETROLEUM PIPELINE (JET FUEL) PER FEDERAL D.O.T REQUIREMENTS. | |
T20RW02638 | FINAL | 05/11/2020 | 06/27/2020 | ROW | PAVNG JULAIN WASH BIKE PATH, LANE CLOSURE FOR TRUCK ACCESS ****PERMIT FOR WORK WITHIN COT ROW ONLY**** ADDRESS CHANGED FROM "UPRR AT HOUGHTON & RITA ROAD" TO "8755 S RITA RD" ***CONTRACTOR MUST REACH OUT TO INSPECTOR FOR PRE-CON BEFOR ANY WORK CAN BE DONE*** | |
T21FC00643 | FINAL | 08/18/2021 | 07/20/2022 | FIRECONS | Modify existing wet pipe fire sprinkler system. | |
T21RW03645 | FINAL | 08/06/2021 | 10/13/2021 | ROW | UNION PACIFIC RAILROAD HAS A 6 HOUR REPAIR REQUIRING A FULL CLOSURE THEY INTEND TO DO TO THE RAILROAD TRACKS LOCATED ON RITA WAY SOUTH OF E OLD VAIL ROAD. | |
T21RW04647 | WITHDRWN | 10/12/2021 | N/A | ROW | S.2878460-2- ALONG WEST SIDE OF S. RITA RD. ACCESS MH 22824 TO SPLICE EXISTING CABLE. | |
T22FC00049 | FINAL | 01/18/2022 | 01/21/2023 | FIRECONS | Install 3 new modules to monitor new sprinkler riser installed and permitted by Kazal Fire. |
Plans
Address: 8755 S RITA RD
Date - 11/25/2024 1:24 a.m.
Total Number Of Plans - (4)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T06BA00005 | Approved | 01/04/2006 | N/A | -- Stormwater Basin | ||
C9-00-23 | EFFECTED | 03/14/2006 | N/A | REZONING PROCEDURES -- REZONE | Proposal for approximately 550,000 square-foot food and beverage plant on 85 acres and 795,000 square feet of industrial uses within a 99-acre employment campus, and 270,000 square feet of commercial uses on approximately 37 acres. RZ06-020: Proposal for approximately 550,000 square-foot food and beverage plant on 85 acres (northern parcel). RZ06-022: C-2 zoning for 270,000 square feet of commercial uses on approximately 37 acres. RZ06-024: Time extension for C-2 zoning for 270,000 square feet of commercial uses on approximately 37 acres. RZ07-025: Development Plan for I-1 zoning for a 1,179,250 square foot, one-story distribution center in lieu of the previously approved 795,000 square foot employment campus on 99.0 acres (southeast portion). | |
T09PRE0002 | APPLIED | 01/20/2009 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | ||
T21PRE0102 | CLOSED | 04/22/2021 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Site: Faribault. |