Permit: TD-DEV-0924-00246
Permit Details
Apply Date:
09/03/2024
Applicant:
angel islas
Description:
new multi family and clinic with associated parking, landscape and drainage
Permit Reviews
Permit Number - TD-DEV-0924-00246
Permit Status: Inspections
Permit Description: new multi family and clinic with associated parking, landscape and drainage
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/14/2024 | DEVELOPMENT PACKAGE NEW v.2 | 01/10/2025 | APPROVED |
| 09/09/2024 | DEVELOPMENT PACKAGE NEW v.1 | 10/24/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0924-00246
Permite Description: new multi family and clinic with associated parking, landscape and drainage
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | N/A | Partial Pass | Installation of the drainage pipe looks good at this time | |
| 09/04/2025 | COT - BASN - Drainage/Basin - Condition Inspection | N/A | Partial Pass | Basin progress is good. Weir is complete and final depth of basin is accurate. Basin floor is being ripped, next step is riprap for the sides. |
| 10/24/2025 | N/A | Partial Pass | Irrigation trenching is appropriate depth and location. Pipe size is good. Bedding is sufficient. Okay to backfill. | |
| 10/24/2025 | N/A | Partial Pass | No nursery bought plants on site yet. Several NPPO plants in temp nursery are dead, will need to be replaced. | |
| 10/27/2025 | N/A | Partial Pass | Okay to grout refuse enclose final lift. Okay to pour remaining retaining wall footing. | |
| 11/04/2025 | For trash and recycling enclosures | N/A | Partial Pass | Contractor can pour the apron for the trash enclosure and the footing for the little wall on the east side |
| 11/13/2025 | ENGR Paving | N/A | Partial Pass | Final paving outside of valley gutter and South parking lot: tack coat is good, edges are ready, paving progress is good. |
| 11/17/2025 | LAND Landscape Appearance & Function Final | N/A | Partial Pass | Contractor still has plans to transplant from the nursery |
| 11/17/2025 | SITE - Stormwater Final Inspection | N/A | Complete (Recurring) | |
| 11/18/2025 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to finish all the landscape and backfill in the front off of Prince Road and railing in the back of the building |
| 11/18/2025 | NPPO Final | N/A | Not Ready | 3 of the 7 NPPO are dead and need to be replaced. Final location is in question. We will need to revisit this inspection once a plan has been approved |
| 11/24/2025 | Consultation SITE | N/A | Partial Pass | 11/24/25 - Discussed items necessary for Engineering Final. 1. Landscape plan for adjacent development to incorporate NPPO plants. 2. ROW along Prince needs landscape rock. 3. EV ready pedestals need installed. 4. ADA parking sign on south side needs installed. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0924-00246
Permit Description: new multi family and clinic with associated parking, landscape and drainage
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/27/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | informed the contractor to call in every two weeks for sweep inspection. As of right now all the wattles and the truck out rock are in place. Also informed the contractor to have a set of plans on site at all times and all material testing testing on site like subgrade AB asphalt concrete. | |
| 10/24/2025 | SITE - Stormwater Follow-up | Passed | Site is good overall. Need to set up a designated concrete washout area with proper containment. | |
| 11/17/2025 | ENGR Grading Final | Passed | ||
| 11/18/2025 | COT - ENGR - Signage Final | Passed | Signage is in place, including address numbers. | |
| 11/18/2025 | Final inspection to ensure all landscape and water harvesting SITE | Passed | Water harvesting areas are complete in accordance with approved plans. |