Inspection Status: Partial Pass
Inspection History
| Date |
Description |
Inspector |
Results |
Comments |
| 09/11/2025 |
|
|
Partial Pass |
Contractors good to pour the foundation for the small wall south of the building |
| 09/16/2025 |
|
|
Partial Pass |
contractors good to POUR the retaining wall south of the building |
| 10/23/2025 |
|
|
Passed |
Retaining wall along East boundary, from the midpoint of the building running south: footer dimensions and reinforcement are correct. Okay to pour footer. |
| 10/27/2025 |
|
|
Partial Pass |