Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 02/05/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor called in the wrong inspection. Contractor need to call in for stormwater pipe. Contractor excavated for 18 inch HDP pipe. Contractor also is taking density today and will send me the results today. |
| 11/18/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to finish all the landscape and backfill in the front off of Prince Road and railing in the back of the building |
| 12/10/2025 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to complete the fence along Prince Road and around basin in the back |
| 12/31/2025 |
ENGR Engineering Final
|
|
Passed |
|