Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
Permit Number - TD-DEV-0924-00246
Inspection Description - ENGR Engineering Final
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2025 | ENGR Engineering Final | Partial Pass | Contractor called in the wrong inspection. Contractor need to call in for stormwater pipe. Contractor excavated for 18 inch HDP pipe. Contractor also is taking density today and will send me the results today. | |
| 11/18/2025 | ENGR Engineering Final | Partial Pass | Contractor needs to finish all the landscape and backfill in the front off of Prince Road and railing in the back of the building |