Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-0924-00246
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2025 | Partial Pass | Contractors good to backfill the HD pipe | ||
| 02/12/2025 | Partial Pass | Contractor called me so I could look at all the inlets that we brought in for the project. There’s no concerns at this time on the new inlet contractor will call me when they are installed. | ||
| 02/18/2025 | Partial Pass | Installation of the drainage pipe looks good at this time | ||
| 05/23/2025 | Partial Pass | 5/23/25 I noted one length of 8" X 14' PVC, the first private section at manhole where it connects to the county. Manhole not on site yet. | ||
| 05/28/2025 | Partial Pass | Contractor installing 8 inch sewer line from the manhole off the street to private property | ||
| 05/29/2025 | Partial Pass | Contractor can backfill the eight in sewer line | ||
| 08/06/2025 | Partial Pass | Schedule 40 pvc 8" sewer connection at the building 8" clean out and with Y to 4" clean outs outs. Green tracer wire in place. 36' + depth. Connections good. OK to backfill. |