Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/27/2025 |
PDSD Engineering Division Pre-Construction SITE |
|
Passed |
informed the contractor to call in every two weeks for sweep inspection. As of right now all the wattles and the truck out rock are in place. Also informed the contractor to have a set of plans on site at all times and all material testing testing on site like subgrade AB asphalt concrete. |