Permit: TD-DEV-0723-00325
Permit Details
Status:
Issued
Type:
Development Package
Address:
820 E TUCSON MARKETPLACE BL
Address NEW:
820 E TUCSON MARKETPLACE BL
Apply Date:
07/21/2023
Applicant:
Catherine Otis
Description:
Restricted Access - Revision 4 - Pavement Changes started 8.22.25** Construction of a +/-53,802 SF, 3 story, rehabilitation hospital. Approval from the Bridges DRC has been obtained and is included with this submittal.
Permit Reviews
Permit Number - TD-DEV-0723-00325
Permit Status: Issued
Permit Description: Restricted Access - Revision 4 - Pavement Changes started 8.22.25** Construction of a +/-53,802 SF, 3 story, rehabilitation hospital.
Approval from the Bridges DRC has been obtained and is included with this submittal.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/26/2024 | DEVELOPMENT PACKAGE NEW v.1 | 07/30/2024 | REQUIRES RESUBMIT |
| 07/21/2023 | DEVELOPMENT PACKAGE NEW v.1 | 07/24/2023 | REQUIRES RESUBMIT |
| 01/07/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 02/05/2025 | APPROVED |
| 08/29/2023 | DEVELOPMENT PACKAGE NEW v.3 | 09/18/2023 | REQUIRES RESUBMIT |
| 07/09/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 07/28/2025 | APPROVED |
| 02/21/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 03/19/2025 | APPROVED |
| 07/28/2023 | DEVELOPMENT PACKAGE NEW v.2 | 08/29/2023 | REQUIRES RESUBMIT |
| 10/18/2023 | DEVELOPMENT PACKAGE NEW v.4 | 11/17/2023 | REQUIRES RESUBMIT |
| 12/13/2023 | DEVELOPMENT PACKAGE NEW v.5 | 01/11/2024 | REQUIRES RESUBMIT |
| 07/30/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 09/26/2024 | APPROVED |
| 10/28/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 12/02/2024 | REQUIRES RESUBMIT |
| 08/22/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 09/24/2025 | APPROVED |
| 05/16/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 06/17/2025 | REQUIRES RESUBMIT |
| 01/18/2024 | DEVELOPMENT PACKAGE NEW v.6 | 01/26/2024 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0723-00325
Permite Description: Restricted Access - Revision 4 - Pavement Changes started 8.22.25** Construction of a +/-53,802 SF, 3 story, rehabilitation hospital.
Approval from the Bridges DRC has been obtained and is included with this submittal.
Total Outstanding Inspections - 10
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2024 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | |
| 01/02/2025 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | This inspection should have been called in as a stormwater pipe inspection. Passed the north west side behind the building. |
| 04/29/2025 | SITE - SWPPP Violation Notice | N/A | Not Ready | SWPPP book needs to be updated to be current with 04/29/2025. Last entry was 02/25. All side streets need to be cleaned. Any temporary entrance/exit needs to have a traffic pad. There are maintenance issues on the wattle in several areas that need to be repaired or replaced. Ensure the concrete washout is not hitting the ground, even the simplest method as a kiddie pool. |
| 06/25/2025 | SITE - Stormwater Follow-up | N/A | Partial Pass | Repair/replace wattle as needed. Refresh track out rock to keep street clean. Fix SWPPP board info. |
| 10/06/2025 | N/A | Partial Pass | Contractors good to pour the ramp for the hospital in the front. Contractor needs to remove part of the curb in the sidewalk on the southwest corner where the valley gutters are at. Contract is good to pour for that valley gutter on the south west quadrant. | |
| 11/12/2025 | ENGR - Drainage Structures | N/A | Partial Pass | Okay to pour collar. |
| 08/13/2025 | N/A | Partial Pass | 8/13/25 Okay to pour bollards in loading/refuse enclosure area. Schedule reinspection after poured to final out these bollards if all bollards are poured. I looked at 30 8” STD galv pipe Bollards. Located in the SW loading dock/ refuse enclosure area. The standard before RFI was 2’ dia footers w/ 5’ embedment. Reinforcement- 6 #7 verts & #3 ties at 10 OC. 10 out of the 29 bollards had a RFI # 171 (Bollards at footing detail) These where bollards 8” STD galv pipe bollards with 1/2” x 1’ base plates welded to bottom. 1’-4” embedment. 8 #7 verts drilled and epoxied (special inspection Ninyo Moore) w/ #3 ties at 10” oc. In lieu of 6 verts without hooks. Some of the spacing layout was also revised to reflect where underground electrical/utilities forced relocation of bollards. |
|
| 12/02/2025 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 12/02/2025 | ENGR Grading Final | N/A | Partial Pass | 12/2/25 Area of unpaved lot to the north side of parking lot and the loading/refuse enclosure area behind building. Grade hubs are in place and good. 3" of AC on 4" ABC. AB needs to be at 95% compaction. String line is good in areas where curb is correct to hubs. Contractor will provide me with pictures of areas where reveal needs to be corrected in a few areas we discussed. Pending compaction results comply with Geo tech recommendations Okay to pave both areas. |
| 08/05/2025 | ENGR Paving | N/A | Partial Pass | Hubs and sub grade have been completed, hubs were visible in several areas. Compaction test will be submitted. An is going in now and will be scheduled for Thursday for compaction and blue top. |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-0723-00325
Permit Description: Restricted Access - Revision 4 - Pavement Changes started 8.22.25** Construction of a +/-53,802 SF, 3 story, rehabilitation hospital.
Approval from the Bridges DRC has been obtained and is included with this submittal.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 01/06/2025 | SITE - Stormwater Setup and Controls | Passed | ||
| 12/01/2025 | SITE - Stormwater Final Inspection | Passed |