Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
07/21/2023
Applicant:
Catherine Otis
Description:
Restricted Access - Revision 4 - Pavement Changes started 8.22.25** Construction of a +/-53,802 SF, 3 story, rehabilitation hospital. Approval from the Bridges DRC has been obtained and is included with this submittal.

Permit Reviews

Permit Number - TD-DEV-0723-00325
Permit Status: Issued
Permit Description: Restricted Access - Revision 4 - Pavement Changes started 8.22.25** Construction of a +/-53,802 SF, 3 story, rehabilitation hospital. Approval from the Bridges DRC has been obtained and is included with this submittal.
Start Date Submittal Complete Date Status  
07/26/2024 DEVELOPMENT PACKAGE NEW v.1 07/30/2024 REQUIRES RESUBMIT Review Details
07/21/2023 DEVELOPMENT PACKAGE NEW v.1 07/24/2023 REQUIRES RESUBMIT Review Details
01/07/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 02/05/2025 APPROVED Review Details
08/29/2023 DEVELOPMENT PACKAGE NEW v.3 09/18/2023 REQUIRES RESUBMIT Review Details
07/09/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 07/28/2025 APPROVED Review Details
02/21/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 03/19/2025 APPROVED Review Details
07/28/2023 DEVELOPMENT PACKAGE NEW v.2 08/29/2023 REQUIRES RESUBMIT Review Details
10/18/2023 DEVELOPMENT PACKAGE NEW v.4 11/17/2023 REQUIRES RESUBMIT Review Details
12/13/2023 DEVELOPMENT PACKAGE NEW v.5 01/11/2024 REQUIRES RESUBMIT Review Details
07/30/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 09/26/2024 APPROVED Review Details
10/28/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 12/02/2024 REQUIRES RESUBMIT Review Details
08/22/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 09/24/2025 APPROVED Review Details
05/16/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 06/17/2025 REQUIRES RESUBMIT Review Details
01/18/2024 DEVELOPMENT PACKAGE NEW v.6 01/26/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-0723-00325
Permite Description: Restricted Access - Revision 4 - Pavement Changes started 8.22.25** Construction of a +/-53,802 SF, 3 story, rehabilitation hospital. Approval from the Bridges DRC has been obtained and is included with this submittal.
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
07/02/2024 SITE - Stormwater Setup and Controls N/A Complete (Recurring)
01/02/2025 COT - ENGR - Stormwater N/A Complete (Recurring) This inspection should have been called in as a stormwater pipe inspection. Passed the north west side behind the building.
04/29/2025 SITE - SWPPP Violation Notice N/A Not Ready SWPPP book needs to be updated to be current with 04/29/2025. Last entry was 02/25.
All side streets need to be cleaned.
Any temporary entrance/exit needs to have a traffic pad.
There are maintenance issues on the wattle in several areas that need to be repaired or replaced.
Ensure the concrete washout is not hitting the ground, even the simplest method as a kiddie pool.
06/25/2025 SITE - Stormwater Follow-up N/A Partial Pass Repair/replace wattle as needed. Refresh track out rock to keep street clean. Fix SWPPP board info.
10/06/2025 N/A Partial Pass Contractors good to pour the ramp for the hospital in the front. Contractor needs to remove part of the curb in the sidewalk on the southwest corner where the valley gutters are at. Contract is good to pour for that valley gutter on the south west quadrant.
11/12/2025 ENGR - Drainage Structures N/A Partial Pass Okay to pour collar.
08/13/2025 N/A Partial Pass 8/13/25

Okay to pour bollards in loading/refuse enclosure area.
Schedule reinspection after poured to final out these bollards if all bollards are poured.

I looked at 30 8” STD galv pipe Bollards. Located in the SW loading dock/ refuse enclosure area.
The standard before RFI was 2’ dia footers w/ 5’ embedment. Reinforcement- 6 #7 verts & #3 ties at 10 OC.
10 out of the 29 bollards had a RFI # 171 (Bollards at footing detail) These where bollards 8” STD galv pipe bollards with 1/2” x 1’ base plates welded to bottom. 1’-4” embedment. 8 #7 verts drilled and epoxied (special inspection Ninyo Moore) w/ #3 ties at 10” oc. In lieu of 6 verts without hooks.
Some of the spacing layout was also revised to reflect where underground electrical/utilities forced relocation of bollards.
12/02/2025 COT - ENGR - Signage Final N/A Not Ready
12/02/2025 ENGR Grading Final N/A Partial Pass 12/2/25
Area of unpaved lot to the north side of parking lot and the loading/refuse enclosure area behind building. Grade hubs are in place and good. 3" of AC on 4" ABC. AB needs to be at 95% compaction. String line is good in areas where curb is correct to hubs. Contractor will provide me with pictures of areas where reveal needs to be corrected in a few areas we discussed. Pending compaction results comply with Geo tech recommendations Okay to pave both areas.
08/05/2025 ENGR Paving N/A Partial Pass Hubs and sub grade have been completed, hubs were visible in several areas. Compaction test will be submitted. An is going in now and will be scheduled for Thursday for compaction and blue top.

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0723-00325
Permit Description: Restricted Access - Revision 4 - Pavement Changes started 8.22.25** Construction of a +/-53,802 SF, 3 story, rehabilitation hospital. Approval from the Bridges DRC has been obtained and is included with this submittal.
Total Completed Inspections - 3
Date Description Inspector Results Comments
07/02/2024 PDSD Engineering Division Pre-Construction SITE Passed
01/06/2025 SITE - Stormwater Setup and Controls Passed
12/01/2025 SITE - Stormwater Final Inspection Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
NOBIS REHAB TUCSON AZ - CIVIL PLAN SET-PR 6 - 02.19.25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW