Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
2nd part of drainage, 01/06/25 |
| 01/10/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Drainage pipe on the right side of entrance 01/10/25 |
| 03/05/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Drainage pipe on the right side of entrance 01/10/25, drainage pipe on the south west side good to backfill on 03/05/25. |
| 11/10/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractors installing an a dot collar on the north end of the property |
| 11/12/2025 |
ENGR - Drainage Structures |
|
Passed |
Okay to pour collar. |