Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
2nd part of drainage, 01/06/25 |
| 01/10/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Drainage pipe on the right side of entrance 01/10/25 |
| 03/05/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Drainage pipe on the right side of entrance 01/10/25, drainage pipe on the south west side good to backfill on 03/05/25. |
| 11/10/2025 |
ENGR - Drainage Structures |
|
Partial Pass |
Contractors installing an a dot collar on the north end of the property |
| 11/12/2025 |
ENGR - Drainage Structures |
|
Passed |
Okay to pour collar. |