Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: ENGR - Drainage Structures
Permit Number - TD-DEV-0723-00325
Inspection Description - ENGR - Drainage Structures
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | ENGR - Drainage Structures | Partial Pass | 2nd part of drainage, 01/06/25 | |
| 01/10/2025 | ENGR - Drainage Structures | Partial Pass | Drainage pipe on the right side of entrance 01/10/25 | |
| 03/05/2025 | ENGR - Drainage Structures | Partial Pass | Drainage pipe on the right side of entrance 01/10/25, drainage pipe on the south west side good to backfill on 03/05/25. | |
| 11/10/2025 | ENGR - Drainage Structures | Partial Pass | Contractors installing an a dot collar on the north end of the property | |
| 11/12/2025 | ENGR - Drainage Structures | Partial Pass | Okay to pour collar. |