Inspection History Details
Inspection Status: Partial Pass
Inspection History
Permit Number - TD-DEV-0723-00325
Inspection Description -
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2025 | Partial Pass | 08/21/25, sidewalks on the south front side of building are good to pour. Bollards will be required on the front entry circle drive. See Tucson standards as described on your plan set. | ||
| 09/03/2025 | Partial Pass | Good to pour. | ||
| 09/04/2025 | Failed | 09/04/25, Do not pour the stairs and ramp in the garden area that is considered a therapy ramp. Slope is exceedingly more than the required 8.333% allowed by code. Unless the architect/engineer can prove by medical means that this pitch of 14.5% is required do not pour. | ||
| 10/06/2025 | Partial Pass | Contractors good to pour the ramp for the hospital in the front. Contractor needs to remove part of the curb in the sidewalk on the southwest corner where the valley gutters are at. Contract is good to pour for that valley gutter on the south west quadrant. |