Inspection Status: Complete (Recurring)
Inspection History: COT - ENGR - Stormwater
| Date |
Description |
Inspector |
Results |
Comments |
| 01/02/2025 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
This inspection should have been called in as a stormwater pipe inspection. Passed the north west side behind the building. |
| 01/06/2025 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
|
| 03/24/2025 |
COT - ENGR - Stormwater |
|
Partial Pass |
Contractor installed 8 inch and 12 inch DPE storm drain pipe up against the building on the east side by the center leading to basin coming off one of the main lines |