Inspection Status: Complete (Recurring)

Inspection History: COT - ENGR - Stormwater

Date Description Inspector Results Comments
01/02/2025 COT - ENGR - Stormwater Complete (Recurring) This inspection should have been called in as a stormwater pipe inspection. Passed the north west side behind the building.
01/06/2025 COT - ENGR - Stormwater Complete (Recurring)
03/24/2025 COT - ENGR - Stormwater Partial Pass Contractor installed 8 inch and 12 inch DPE storm drain pipe up against the building on the east side by the center leading to basin coming off one of the main lines