Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
| 04/04/2025 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
The concrete washout is missing, please reinstall |
| 04/17/2025 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
No concern at this time everything looks good |
| 04/29/2025 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
|
| 06/03/2025 |
SITE - Stormwater Follow-up
|
|
Complete (Recurring) |
Street needs to be cleaned on the south side of project, track out from site could cause issues. |
| 06/25/2025 |
SITE - Stormwater Follow-up
|
|
Partial Pass |
Repair/replace wattle as needed. Refresh track out rock to keep street clean. Fix SWPPP board info. |