Permit Details

Status:
Inspections Complete
Type:
Development Package
Address:
2524 S WILMOT RD
Address NEW:
2524 S WILMOT RD
Apply Date:
05/16/2025
Applicant:
Description:
Rev 1 - Update to basins, concrete, grating, etc, started 03.18.2026 ** Construction documents for the Fry's #33 fuel center. The site plan was approved though: TD-DEV-0724-00193.

Permit Reviews

Permit Number - TD-DEV-0525-00139
Permit Status: Inspections complete
Permit Description: Rev 1 - Update to basins, concrete, grating, etc, started 03.18.2026 ** Construction documents for the Fry's #33 fuel center. The site plan was approved though: TD-DEV-0724-00193.
Start Date Submittal Complete Date Status  
08/04/2025 DEVELOPMENT PACKAGE NEW v.2 10/24/2025 REQUIRES RESUBMIT Review Details
11/24/2025 DEVELOPMENT PACKAGE NEW v.3 12/16/2025 APPROVED Review Details
03/18/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 04/16/2026 APPROVED Review Details
05/19/2025 DEVELOPMENT PACKAGE NEW v.1 07/09/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-0525-00139
Permit Status: Inspections complete
Permit Description: Rev 1 - Update to basins, concrete, grating, etc, started 03.18.2026 ** Construction documents for the Fry's #33 fuel center. The site plan was approved though: TD-DEV-0724-00193.
Total Outstanding Activity Conditions - 1
Date Name
12/15/2025 Prior to Final - The dry well CC&Rs as well as dry well registration with ADWR are required prior to final.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TD-DEV-0525-00139
Permite Description: Rev 1 - Update to basins, concrete, grating, etc, started 03.18.2026 ** Construction documents for the Fry's #33 fuel center. The site plan was approved though: TD-DEV-0724-00193.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
02/11/2026 N/A Partial Pass Drain pipe under the canopy is proper depth and slopes. Pipe material and size has been changed - still pending approval from Engineer. 12" HDPE used in place of 10" Sch. 80 PVC under the canopy for the roof drain conveyance. Bedding is good. Backfill at contractor's risk until material change is approved by engineer of record.
02/11/2026 ENGR - Drainage Structures N/A Partial Pass RCP has been set into place in the drywell and upstream of the Envibro system. Excavation for the Envibro system is open with shoring in place.
04/10/2026 N/A Partial Pass Okay to grout second lift. Send pictures of grouting and vibration.
05/15/2026 ENGR Paving N/A Partial Pass Okay to place 2” for 2nd lift.
05/14/2026 N/A Partial Pass Ok to backfill irrigation trenches when lines are completed. Trenches and pipes correct for laterals and mainline. Equipment correct.
05/14/2026 N/A Not Ready Nothing planted.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TD-DEV-0525-00139
Permit Description: Rev 1 - Update to basins, concrete, grating, etc, started 03.18.2026 ** Construction documents for the Fry's #33 fuel center. The site plan was approved though: TD-DEV-0724-00193.
Total Completed Inspections - 19
Date Description Inspector Results Comments
01/13/2026 PDSD Engineering Division Pre-Construction SITE Passed
03/19/2026 Consultation SITE Passed 3/19/26Met with contractor to go over inspections that should be called in on the DP, such as site walls and the Refuse Enclosure going forward..
05/04/2026 For trash and recycling enclosures Passed Trash enclosure is complete in accordance with approved plans.
05/13/2026 Passed
05/13/2026 ENGR - Drainage Structures Passed
05/13/2026 Passed
05/13/2026 Passed Bollards installed per plan.
05/13/2026 Passed
05/13/2026 Passed
05/18/2026 ENGR Paving Passed On-site paving is complete in accordance with approved plans.
05/20/2026 Passed Irrigation system is installed in accordance with approved plans.
05/20/2026 Passed Shrubs and trees are installed in accordance with approved.
05/22/2026 SITE - Zoning Final Passed Site is in conformance with zoning requirements.
05/22/2026 Passed All items related to striping, parking, and pedestrian circulation are complete in accordance with approved plans.
05/27/2026 COT - FCON - Fire - Final Passed
05/27/2026 COT - ENGR - Signage Final Passed Site signage is complete in accordance with approved plans.
05/28/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
05/28/2026 Final inspection to ensure all landscape and water harvesting SITE Passed All water harvesting infrastructure is complete.
05/28/2026 LAND Landscape Appearance & Function Final Passed All landscaping is complete in accordance with approved plans.

Documents

File Name Document Type  
02 FINAL DRAINAGE REPORT_V1.PDF DOCUMENTS VIEW
03 ROW LETTER_V1.PDF DOCUMENTS VIEW
04 GEOTECH FOUNDATION LETTER_V1.PDF DOCUMENTS VIEW
09 SEWER MEMO_V1.PDF DOCUMENTS VIEW
APPROVED - 01 CIVIL PLANS_V3 - STAMPED 12.16.2025.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
TEP FACILITIES MAP.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW
TEP FACILITIES MAP.PDF DOCUMENTS VIEW