Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TD-DEV-0525-00139
Parcel: 131132540

Address:
2524 S WILMOT RD

Review Status: Requires Resubmit

Review Details: DEVELOPMENT PACKAGE NEW v.1

Permit Number - TD-DEV-0525-00139
Review Name: DEVELOPMENT PACKAGE NEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/23/2025 Commercial Plumbing Standard APPROVED
06/18/2025 ROW Engineering Review Standard APPROVED
06/25/2025 Site Engineering Standard REQUIRES RESUBMIT 1. Underground retention is prohibited by the Design Standards for Stormwater Detention and Retention Manual unless approval from the floodplain administrator.
2. Approval of the use of a drywell for this project will be dependent on the condition that the Dry Well Standards are met from section 4.19 of the Design Standards for Stormwater Detention and Retention Manual. Please include a letter in the next submittal addressing each standard found in section 4.19 and how it is being met.
3. Approval of the use of underground storage for this project will be dependent on the condition that the underground storage standards are met from section 4.13 of the Design Standards for Stormwater Detention and Retention Manual. Please include a letter in the next submittal addressing each standard found in section 4.13 and how it is being met.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
06/26/2025 Site Landscape Standard REQUIRES RESUBMIT CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: CONSTRUCTION DOCUMENTS FOR THE FRY'S #33 FUEL CENTER
ACTIVITY NO: TD-DEV-0525-00139
ADDRESS: 2524 S WILMOT RD
ZONING: C-2 COMMERCIAL ZONE
LAND USE: COMMERCIAL FUEL CENTER

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

Please resubmit revised drawings along with a detailed response letter, which states how all of the Site Landscape and NPPO Section review comments have been addressed.

SITE LANDSCAPE/NPPO SECTION COMMENTS:

1. Compile all applicable plans into one construction document package. Site plan, civil grading plans, landscape plans, detail sheets, etc. Update the cover sheet to include a sheet index of all applicable plans within the CD set. Update all sheets to reflect a total number of sheets in the set. IE: (1 of 44).

2. Provide the development package case number, TD-DEV-0525-00139, adjacent to the title block on all sheets in the CD set, per Administrative Manual 2-06.4.3

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
06/25/2025 Site Zoning Standard REQUIRES RESUBMIT On resubmittal, please combine all sheets into one document and include a sheet index on the cover page.
05/19/2025 CDRC Application Completeness Express REVIEW COMPLETED
05/30/2025 CDRC Review Coordinator Express REVIEW COMPLETED EXTERNAL REVIEWERS
CDRC added TEP PAG, USPS, SWG to the workflow. Review request email sent to TEP. FYI email sent to PAG, USPS, SWG.
05/30/2025 External Reviewers - Pima Association of Governments Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
05/30/2025 External Reviewers - Southwest Gas Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
07/09/2025 External Reviewers - Tucson Electric Power (TEP) Standard REVIEW COMPLETED July 9, 2025
WO#T152840
City of Tucson
Planning and Development Services
Attn: CDRC Admin Team
Dear CDRC Admin Team
Subject: CFN
TD-DEV-0525-00139
Tucson Electric Power Company (TEP) has reviewed and approved the development
plan submitted 5/30/2025. There are existing facilities within the development which are
depicted upon the plan. No apparent conflicts, but there is no Private Utility page
attached to the plans.
Enclosed is a copy of a TEP facilities map showing the approximate location of the
existing facilities. Any relocation costs will be billable to the customer.
To apply for electric service, please call the New Construction department at (520) 918-
8300. Please submit a final set of plans including approved site, electric load, paving
off-site improvements and irrigation plans. If available, include a PDF version of the
plans.
If easements are required, they will be secured by separate instrument. Should you
have any easement questions, please contact our Land Resources Department,
LandReviews@tep.com.
Should you have any technical questions, please contact the area designer,
Martin Rodriguez
(520) 991-5495
mrodriguez@tep.com
Sincerely,
Design Admins
Design Admins
Tucson Electric Power
05/30/2025 External Reviewers - United States Postal Service (USPS) Standard REVIEW COMPLETED FYI
CDRC sent FYI email sent to PAG, USPS, SWG. No further action is required.
06/10/2025 Fire New Construction Standard REVIEW COMPLETED The following plans have been reviewed for compliance with Adopted Fire Codes:
1. Site plans, civil plans, private utilities and landscape.
2. The fuel systems piping plans was reviewed and requires a separate submittal and permit at the time of submittals for construction. Please contact jesus.silva@tucsonsz.gov for instruction when ready.
sal.erivezjr@tucsonaz.gov
05/29/2025 OK to Submit - Engineering Fast REVIEW COMPLETED
05/27/2025 OK to Submit - Zoning Fast REVIEW COMPLETED
06/13/2025 ROW Review REVIEW COMPLETED