Inspection History Details
Inspection Status: Partial Pass
Inspection History
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2026 | Partial Pass | 3/19/26 4 -6” bollards at west side prot protecting fuel tank vents and overfill alarm set correct in 3.5’ x18 dia sonotubes. OK too pour 5 -6” inch bollards placed west of kiosk set correct. 3.5’ 18’dia holes. Bollards will be 3 feet above finish grade. okay to pour. |
||
| 03/23/2026 | Partial Pass | Bollards around north side of kiosk are good to pour. | ||
| 05/13/2026 | Passed | Bollards installed per plan. |