Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
355 N WILMOT RD
Address NEW:
355 N WILMOT RD
Apply Date:
10/23/2023
Applicant:
adam davis
Description:
This for the construction of a new Group I-2 Institutional - Condition 2, Type I-B Construction, 4 Story In-Patient Rehabilitation Hospital at 355 N. Wilmot Road, Tucson. This will be for the Building Permit connected with the civil and rezoning of the site for Account No. TD-DEV-0623-00283 being currently reviewed.

Permit Reviews

Permit Number - TC-COM-1023-02505
Permit Status: Inspections
Permit Description: This for the construction of a new Group I-2 Institutional - Condition 2, Type I-B Construction, 4 Story In-Patient Rehabilitation Hospital at 355 N. Wilmot Road, Tucson. This will be for the Building Permit connected with the civil and rezoning of the site for Account No. TD-DEV-0623-00283 being currently reviewed.
Start Date Submittal Complete Date Status  
10/30/2023 COMMERCIAL REVIEW - FULL v.1 11/30/2023 REQUIRES RESUBMIT Review Details
12/22/2023 COMMERCIAL REVIEW - FULL v.2 01/23/2024 REQUIRES RESUBMIT Review Details
07/16/2024 COMMERCIAL REVIEW - FULL v.1 08/16/2024 REQUIRES RESUBMIT Review Details
08/29/2024 COMMERCIAL REVIEW - FULL v.2 10/02/2024 APPROVED Review Details
10/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/11/2024 APPROVED Review Details
05/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/22/2024 APPROVED Review Details
03/04/2024 RESTAMP - COMMERCIAL v.1 03/05/2024 APPROVED Review Details
10/02/2024 RESTAMP - COMMERCIAL v.1 10/02/2024 APPROVED Review Details
12/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2024 APPROVED Review Details
01/25/2024 COMMERCIAL REVIEW - FULL v.3 03/04/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-1023-02505
Permit Status: Inspections
Permit Description: This for the construction of a new Group I-2 Institutional - Condition 2, Type I-B Construction, 4 Story In-Patient Rehabilitation Hospital at 355 N. Wilmot Road, Tucson. This will be for the Building Permit connected with the civil and rezoning of the site for Account No. TD-DEV-0623-00283 being currently reviewed.
Total Outstanding Activity Conditions - 10
Date Name
01/30/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/30/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
01/30/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
01/30/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
01/30/2024 Masonry Inspection Report submittal review is required.
01/30/2024 SPECIAL INSPECTION FOR MEDICAL GASES IS REQUIRED.
01/30/2024 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
01/30/2024 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
01/30/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Conditions

Permit Number - TC-COM-1023-02505
Permit Status: Inspections
Permit Description: This for the construction of a new Group I-2 Institutional - Condition 2, Type I-B Construction, 4 Story In-Patient Rehabilitation Hospital at 355 N. Wilmot Road, Tucson. This will be for the Building Permit connected with the civil and rezoning of the site for Account No. TD-DEV-0623-00283 being currently reviewed.
Date Description Comments
03/05/2024 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
10/30/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/18/2024
05/22/2024 Stair Designs must be submitted and approved prior to...

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-1023-02505
Permite Description: This for the construction of a new Group I-2 Institutional - Condition 2, Type I-B Construction, 4 Story In-Patient Rehabilitation Hospital at 355 N. Wilmot Road, Tucson. This will be for the Building Permit connected with the civil and rezoning of the site for Account No. TD-DEV-0623-00283 being currently reviewed.
Total Outstanding Inspections - 27
Last Inspection Date Description Inspector Results Comments
07/16/2024 COT - FCON - Sprinkler - Final N/A Not Ready customer did not understand inspection descriptions
07/23/2024 COT - HCPL - Plumbing Progress N/A Partial Pass Main drain on South of building B.
10/30/2024 COT - HCBU - Preslab N/A Partial Pass Level One, West half.
02/06/2025 COT - HCPL - Plumbing Roof Drains N/A Partial Pass Level Three, Area B.
06/12/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass East side to large elevator, and small elevator.
04/28/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass 4th Floor, area A, DWV.
11/26/2024 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass Levels One through Four, North wall.
04/17/2025 COT - HCBU - Framing N/A Partial Pass
06/06/2025 COT - HCEL - Electrical Above Ceiling N/A Re-inspection required Partial Inspection for Level Two: Complete low voltage wiring.
02/25/2025 COT - LCEL - Electrical Underground N/A Partial Pass Generator conduits.
01/29/2025 COT - HCBU - Interior Shear Bracing N/A Not Ready wanted Fire wall.
09/24/2024 COT - HCEL - Electrical Intermediate N/A Partial Pass Main duct banks underslab
04/01/2025 COT - HCME - Mechanical Progress N/A Partial Pass 2nd floor HVAC
10/14/2024 COT - LCPL - Yard Water Line N/A Canceled
08/04/2025 COT - HCME - Kitchen Hood N/A Canceled
08/01/2025 COT - HCBU - Building Above Ceiling N/A Partial Pass Level one.
11/13/2025 COT - HCBU - Building Final N/A Partial Pass Grab bars on Levels 2 and 3.
12/04/2024 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Partial Pass 12/3/2024 4th floor monoco fire proofing approved. Pending columns and beams at stairways. RFI on angle bracing for coverage.
07/30/2024 COT - HCEL - Grounding/Bonding N/A Partial Pass 7/30/24: ufer for northwest corner property okay to place concrete
11/26/2025 ENGR Engineering Final N/A Partial Pass Okay for level 2 TCO. Temporary fencing will separate material, equipment and storage areas from public access for safety will be maintained
COT - FCON - Alarm - Final N/A Not Ready
11/26/2025 COT - HCPL - Medical Gas/Test N/A Partial Pass By SI.
11/21/2025 COT - HCME - Mechanical Final N/A Partial Pass Above Ceiling for rooms 103 South, 143, and 157.
11/24/2025 COT - FCON - Fire - Final N/A Partial Pass floors 2-3-4 passed.
11/14/2025 COT - HCBU - TCO N/A Partial Pass walk 2and 3
11/21/2025 COT - HCPL - Plumbing Final N/A Partial Pass Level Three is ok for Level Two TCO.
11/21/2025 COT - HCEL - Electrical Final N/A Partial Pass Level Three

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-1023-02505
Permit Description: This for the construction of a new Group I-2 Institutional - Condition 2, Type I-B Construction, 4 Story In-Patient Rehabilitation Hospital at 355 N. Wilmot Road, Tucson. This will be for the Building Permit connected with the civil and rezoning of the site for Account No. TD-DEV-0623-00283 being currently reviewed.
Total Completed Inspections - 38
Date Description Inspector Results Comments
07/31/2024 COT - HCEL - Electrical Progress Passed
09/13/2024 COT - HCPL - Plumbing Progress Passed
09/24/2024 COT - HCPL - Sewer Passed
09/24/2024 COT - HCEL - Electrical Underground Passed
10/07/2024 PDSD Heavy Commercial Building Division Pre-Construction Meeting Passed
11/04/2024 COT - HCPL - Rough Soil Passed Balance of Level One.
02/25/2025 COT - HCPL - Plumbing Above Ceiling Passed Level Three, Area A, DWV complete. Area B, scepter for Rooms 312-317. Level One, DWV Room 145. Above ceiling DWV 147.
04/02/2025 COT - HCBU - Preslab Passed
04/02/2025 COT - HCBU - Roof Nailing Passed
04/02/2025 COT - HCPL - Medical Gas Preconstruction Mtg Passed
04/15/2025 COT - HCPL - Plumbing Roof Drains Passed
05/28/2025 COT - HCBU - Excavation/Rebar/Zoning Passed Rebar inspection for the oxygen enclosure slab.
06/03/2025 COT - HCPL - Plumbing Intermediate Passed complete
06/05/2025 COT - HCBU - Exterior Clips/Sheathing Passed
06/16/2025 BULD - Electrical Clearance Passed
07/08/2025 COT - HCBU - Building Progress Passed
07/08/2025 COT - HCBU - Framing Passed
07/21/2025 COT - HCEL - Electrical Above Ceiling Passed
07/21/2025 COT - HCEL - Outdoor Lighting Passed
07/21/2025 COT - LCEL - Electrical Underground Passed
08/04/2025 COT - HCBU - Interior Shear Bracing Passed
08/04/2025 COT - HCBU - Masonry Pregrout Passed
08/04/2025 COT - HCEL - Electrical Intermediate Passed
08/04/2025 COT - HCME - Mechanical Progress Passed
08/04/2025 COT - HCPL - Gas Pressure Test Passed
08/04/2025 COT - LCPL - Yard Water Line Passed
08/04/2025 COT - LCPL - Plumbing Roof Drains Passed
09/17/2025 COT - HCME - Kitchen Hood Passed Complete tie ins to exhaust fans 4,5,&6. Two grease and the other is for the dishwasher. 9/17/2025
09/18/2025 COT - HCPL - Gas Final Passed
10/06/2025 TRSP - ROW - Final/Close-Out Passed
10/10/2025 COT - HCBU - Building Above Ceiling Passed
10/22/2025 COT - HCME - Mechanical Above Ceiling Passed Note: Walls around piping in Soiled hold rooms are not per plans.
10/24/2025 COT - HCME - Mechanical Intermediate Passed
11/21/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
11/21/2025 COT - BULD - SWG Clearance Passed previously inspected
12/04/2025 COT - HCME - Mechanical Final Passed
12/05/2025 COT - HCPL - Plumbing Final Passed
12/05/2025 COT - HCEL - Electrical Final Passed

Documents

File Name Document Type  
GWG3 TRANS SUB - HAYDEN 4 - 12-3-2024_V1.PDF DOCUMENTS VIEW
APPROVED ATS, MTS, QUICK CONNECT FOR DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
APPROVED GENERATOR FOR DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
APPROVED SHOPS AND CALCS FOR DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
APPROVED STOREFRONTS AND CURTAIN WALL CALCS FOR DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
APPROVED STOREFRONTS AND CURTAIN WALL SHOP DRAWINGS FOR DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-VOL. 1 - CONSOLIDATED 100 - LIFE SAFETY CIVIL LANDSCAPING STRUCT - ARCH PR-5.082624_V2_V1.PDF DOCUMENTS VIEW
CONS-VOL. 2 - CONSOLIDATED 100 MEPF DRAWINGS TO PR-4R3_V1_V1.PDF DOCUMENTS VIEW
CONS-VOL. 3 - CONSOLIDATED 100 CONSOLIDATED OWNER VENDOR DRAWINGS TO PR-4R3_V1_V1.PDF DOCUMENTS VIEW
AF STEEL - EAST STAIR COMBINED CALCS AND DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS VOL. 1 THRU VOL. 3 CONSOLIDATED 100 PLANS 012524_V3.PDF DOCUMENTS VIEW