Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Canceled
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-1023-02505
Inspection Description - ENGR Engineering Final
Inspection Status - Canceled
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2025 | ENGR Engineering Final | Canceled | ||
| 11/26/2025 | ENGR Engineering Final | Partial Pass | Okay for level 2 TCO. Temporary fencing will separate material, equipment and storage areas from public access for safety will be maintained | |
| 12/17/2025 | ENGR Engineering Final | Partial Pass | Okay for Level 4 TCO 12/17/25 Bollards need to be finished/painted per plan. Riprap needs to be placed on slope over 3:1 at NW corner Drainage Structure. WHIA basins At east side of parking lot need to be completed. Fence at West side is being installed now. All Construction Materials and Equipment will need to be secured inside temporary fencing At SW corner of parking lot adjacent to Basin. Not to go past Bullnoses of curbs. While using reach fork or other equipment during duration of TCO flaggers must assist operator to keep public safe from equipment. Okay for Level 4 TCO Schedule this inspection when ready to close out final. |