Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCBU - Framing
Permit Number - TC-COM-1023-02505
Inspection Description - COT - HCBU - Framing
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/16/2025 | COT - HCBU - Framing | Partial Pass | Level Three; Ok to one-side. | |
| 01/30/2025 | COT - HCBU - Framing | Canceled | ||
| 02/06/2025 | COT - HCBU - Framing | Partial Pass | Level One; Area A, shafts and corridors. Sheathing on West wall. | |
| 02/12/2025 | COT - HCBU - Framing | Partial Pass | Second Floor Soffits & Ceilings | |
| 02/13/2025 | COT - HCBU - Framing | Partial Pass | Level Four, West wall sheathing. Ok to cover. | |
| 02/25/2025 | COT - HCBU - Framing | Partial Pass | Level One. Level Two, Ceilings. | |
| 03/04/2025 | COT - HCBU - Framing | Partial Pass | West Exterior Soffit | |
| 03/14/2025 | COT - HCBU - Framing | Partial Pass | Lvl 2 Ceilings/Soffits | |
| 03/25/2025 | COT - HCBU - Framing | Partial Pass | Framing and shafts on level 4. | |
| 04/03/2025 | COT - HCBU - Framing | Partial Pass | Outside East. Lvel Four: Shafts. | |
| 04/07/2025 | COT - HCBU - Framing | Partial Pass | Exterior East Stair | |
| 04/17/2025 | COT - HCBU - Framing | Partial Pass | ||
| 04/22/2025 | COT - HCBU - Framing | Partial Pass | st Floor Area B (East) Framing | |
| 04/29/2025 | COT - HCBU - Framing | Partial Pass | ||
| 05/02/2025 | COT - HCBU - Framing | Partial Pass | Level 4 Stairway Framing. | |
| 05/06/2025 | COT - HCBU - Framing | Partial Pass | Level One, Columns at Day room, Level Three, Rooms 310, 310A, 311, 311A and 311B. Level Four, Area A soffits and ceilings. | |
| 05/23/2025 | COT - HCBU - Framing | Partial Pass | 4th floor west stairs framing. | |
| 05/28/2025 | COT - HCBU - Framing | Partial Pass | 4th floor area B, shower ceiling soffits framing. | |
| 06/04/2025 | COT - HCBU - Framing | Partial Pass | Stairwell soffits. | |
| 07/08/2025 | COT - HCBU - Framing | Passed | ||
| 12/05/2024 | COT - HCBU - Framing | Partial Pass | East end projection. | |
| 12/09/2024 | COT - HCBU - Framing | Partial Pass | Partial inspection of Level Two, except grid lines 2-5 from C-D. Looked at Core board, except at Northwest shaft and stairs. Sheathing at East extension. |
|
| 12/13/2024 | COT - HCBU - Framing | Partial Pass | 12/13/24: South side of building levels 3 & 4 are properly framed. Okay to proceed with other work. |