Inspection Status: Partial Pass
Inspection History: COT - HCPL - Rough Soil
| Date |
Description |
Inspector |
Results |
Comments |
| 07/01/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Storm line is 67% complete. Main catch basins are installed and manhole is poured in place. Remaining connections are 4 each 6" lines for roof drains. Okay to shade and backfill north/ south lateral and 120' of east/west lateral lines. |
| 07/02/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Storm drain, South side, from Roof Drain East to 45 degree turn. |
| 07/03/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Two six inch sub grade drains on South side at West end. |
| 07/09/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
South end of main drain. |
| 07/15/2024 |
COT - HCPL - Rough Soil |
|
Passed |
6" main drain, North side of section B. |
| 09/16/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
West half of north main drain. |
| 09/16/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
West half of north main drain. |
| 09/19/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
West half of South main drain. |
| 09/24/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
copper entries in to building |
| 09/24/2024 |
COT - HCPL - Rough Soil |
|
Passed |
|
| 09/30/2024 |
COT - HCPL - Rough Soil |
|
Canceled |
Level One; Women's, men's, and staff restrooms. Sink by TA1 and 4, Drinking fountains. Mop sink. |
| 10/03/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
10/3/24: partial for first 30 feet of main water line north east corner of property |
| 10/10/2024 |
COT - HCPL - Rough Soil |
|
Not Ready |
10-10-24: Level One, Rooms 157, 158, 160, 164, |
| 10/15/2024 |
COT - HCPL - Rough Soil |
|
Canceled |
|
| 10/22/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Level One, Rooms 103 and 154B. |
| 10/28/2024 |
COT - HCPL - Rough Soil |
|
Partial Pass |
Level One, Kitchen. |
| 11/04/2024 |
COT - HCPL - Rough Soil |
|
Passed |
Balance of Level One. |