Inspection History: COT - HCPL - Plumbing Intermediate 

Permit Number - TC-COM-1023-02505

Inspection Description - COT - HCPL - Plumbing Intermediate 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
01/17/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 2nd floor preliminary/progress inspection/meeting
01/28/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Select medical DWV inspection.
Inwa and over head for the following rooms
214A,214,218,219,221,223,224,201A 201 and 226.
01/30/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Domestic water for Level Two, Area A. DWV for Level Two, Area A.
02/04/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Balance of Level Two, Area A.
02/06/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level Two, Area B, DWV except Rooms 232, 233, 235, and 236. Level Three, Domestic water in walls for Rooms 301-305, 332, and 333.
02/07/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level Three, Area A, South side, Domestic water; walls only.
02/12/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level Two, Area B, balance of DWV.
02/12/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level Two, Area B, Domestic water.
02/14/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 2-14-25, line sets for stairwells on east and west ends approved-okay to insulate progress areas. Partial pass for Level 3 area A-DWV ROOM #301-305, 318-322.
02/19/2025 COT - HCPL - Plumbing Intermediate  Partial Pass DWV level 3 Area B (East Side)
02/26/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level Three, Domestic water: Rooms 306, 306A, 307, 307A, 308, 308A, 309, 309A, 310, 310A, 311A, 311D, 312, 312A, 313, 313A, 314, 314A, 315, 315A, 316, 316A, 317, and 317A.
Walls. DWV for Room 313, 314A, 315, and 315A.
02/26/2025 COT - HCPL - Plumbing Intermediate  Passed
02/27/2025 COT - HCPL - Plumbing Intermediate  Partial Pass DWV for 314, 316A, 317A, 351B, 339, and 344. Domestic water in wall for Room 145.
COT - HCPL - Plumbing Intermediate  Partial Pass Level One, Domestic water, walls.
03/04/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level Three, Rooms 337, 339, 341, 343-348, 350, and 351. Level One, Domestic water West Elevator shaft wall, East elevator shaft wall. DWV for hand sink.
03/06/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Domestic hot, cold, and return mains in shaft Levels Two through Four.
03/10/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 3-10-25, level 1-SIDE A-domestic water lines at food preparation, island, 3 compartment sink, dish machine, hand sink verified under test. Okay to continue with construction at progress areas.
03/12/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level Three, Area A, domestic water.
03/14/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level one, in-wall; Eye washes, hand sinks, cart wash, work sink, servers, therapy alcove, and cooking rooms. Exam rooms 114, 115, 118, staff, men's, women's, and ice machine.
03/25/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level one; walls: Rooms 107, 108, 119, washroom in 119, and Kitchen.
03/26/2025 COT - HCPL - Plumbing Intermediate  Not Ready Wanted Roof drains.
04/01/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level Three, Domestic water.
04/04/2025 COT - HCPL - Plumbing Intermediate  Partial Pass
04/10/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level One, DWV for Storage, Clean Holding.
04/14/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level one: Area A, Over head Vent. Area B, Waste for package Two.
04/15/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Grease trap, gas test outside, UG plumbing North side, Level One, Package One, Drain system for Level Three on SouthEast side.
04/22/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 1st Floor Kitchen Domestic Water.
04/28/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 4th Floor, area A, DWV.
04/30/2025 COT - HCPL - Plumbing Intermediate  Partial Pass DWV Level 1 complete
05/06/2025 COT - HCPL - Plumbing Intermediate  Partial Pass
05/22/2025 COT - HCPL - Plumbing Intermediate  Partial Pass Level 4, Area B, North Rooms. DWV and DomesticWater, center rooms in wall Domestic Water.
05/23/2025 COT - HCPL - Plumbing Intermediate  Partial Pass 1st floor ADL room. Level One, Area B, domestic water.
05/30/2025 COT - HCPL - Plumbing Intermediate  Partial Pass DWV Inspection for Level 4 Area B South Wing. DWV complete
06/03/2025 COT - HCPL - Plumbing Intermediate  Passed complete
10/01/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level one: lavs for Men's room and wall cleanout.
10/03/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level One: UG for Men's and Women's toilet and room 119.
10/14/2024 COT - HCPL - Plumbing Intermediate  Not Ready
10/17/2024 COT - HCPL - Plumbing Intermediate  Partial Pass Level One: Room 145, Maintenance Room, and Mechanical Room.