Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Plumbing Intermediate
Permit Number - TC-COM-1023-02505
Inspection Description - COT - HCPL - Plumbing Intermediate
Inspection Status - Partial Pass
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2nd floor preliminary/progress inspection/meeting | |
| 01/28/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Select medical DWV inspection. Inwa and over head for the following rooms 214A,214,218,219,221,223,224,201A 201 and 226. |
|
| 01/30/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Domestic water for Level Two, Area A. DWV for Level Two, Area A. | |
| 02/04/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Balance of Level Two, Area A. | |
| 02/06/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level Two, Area B, DWV except Rooms 232, 233, 235, and 236. Level Three, Domestic water in walls for Rooms 301-305, 332, and 333. | |
| 02/07/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level Three, Area A, South side, Domestic water; walls only. | |
| 02/12/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level Two, Area B, balance of DWV. | |
| 02/12/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level Two, Area B, Domestic water. | |
| 02/14/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 2-14-25, line sets for stairwells on east and west ends approved-okay to insulate progress areas. Partial pass for Level 3 area A-DWV ROOM #301-305, 318-322. | |
| 02/19/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | DWV level 3 Area B (East Side) | |
| 02/26/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level Three, Domestic water: Rooms 306, 306A, 307, 307A, 308, 308A, 309, 309A, 310, 310A, 311A, 311D, 312, 312A, 313, 313A, 314, 314A, 315, 315A, 316, 316A, 317, and 317A. Walls. DWV for Room 313, 314A, 315, and 315A. |
|
| 02/26/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 02/27/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | DWV for 314, 316A, 317A, 351B, 339, and 344. Domestic water in wall for Room 145. | |
| COT - HCPL - Plumbing Intermediate | Partial Pass | Level One, Domestic water, walls. | ||
| 03/04/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level Three, Rooms 337, 339, 341, 343-348, 350, and 351. Level One, Domestic water West Elevator shaft wall, East elevator shaft wall. DWV for hand sink. | |
| 03/06/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Domestic hot, cold, and return mains in shaft Levels Two through Four. | |
| 03/10/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 3-10-25, level 1-SIDE A-domestic water lines at food preparation, island, 3 compartment sink, dish machine, hand sink verified under test. Okay to continue with construction at progress areas. | |
| 03/12/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level Three, Area A, domestic water. | |
| 03/14/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level one, in-wall; Eye washes, hand sinks, cart wash, work sink, servers, therapy alcove, and cooking rooms. Exam rooms 114, 115, 118, staff, men's, women's, and ice machine. | |
| 03/25/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level one; walls: Rooms 107, 108, 119, washroom in 119, and Kitchen. | |
| 03/26/2025 | COT - HCPL - Plumbing Intermediate | Not Ready | Wanted Roof drains. | |
| 04/01/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level Three, Domestic water. | |
| 04/04/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | ||
| 04/10/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level One, DWV for Storage, Clean Holding. | |
| 04/14/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level one: Area A, Over head Vent. Area B, Waste for package Two. | |
| 04/15/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Grease trap, gas test outside, UG plumbing North side, Level One, Package One, Drain system for Level Three on SouthEast side. | |
| 04/22/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1st Floor Kitchen Domestic Water. | |
| 04/28/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 4th Floor, area A, DWV. | |
| 04/30/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | DWV Level 1 complete | |
| 05/06/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | ||
| 05/22/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level 4, Area B, North Rooms. DWV and DomesticWater, center rooms in wall Domestic Water. | |
| 05/23/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | 1st floor ADL room. Level One, Area B, domestic water. | |
| 05/30/2025 | COT - HCPL - Plumbing Intermediate | Partial Pass | DWV Inspection for Level 4 Area B South Wing. DWV complete | |
| 06/03/2025 | COT - HCPL - Plumbing Intermediate | Passed | complete | |
| 10/01/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level one: lavs for Men's room and wall cleanout. | |
| 10/03/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level One: UG for Men's and Women's toilet and room 119. | |
| 10/14/2024 | COT - HCPL - Plumbing Intermediate | Not Ready | ||
| 10/17/2024 | COT - HCPL - Plumbing Intermediate | Partial Pass | Level One: Room 145, Maintenance Room, and Mechanical Room. |