Permit: TC-COM-0825-01553
Permit Details
Apply Date:
08/19/2025
Applicant:
Daniel Chapman
Description:
EXISITNG BUILDING INTO A BARBERSHOP 6000.00
Permit Reviews
Permit Number - TC-COM-0825-01553
Permit Status: Complete
Permit Description: EXISITNG BUILDING INTO A BARBERSHOP 6000.00
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/19/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 09/11/2025 | REQUIRES RESUBMIT |
| 01/02/2026 | ADMINISTRATIVE v.2 | 01/05/2026 | APPROVED |
| 08/24/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/25/2026 | APPROVED |
| 12/15/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 12/30/2025 | APPROVED |
| 12/30/2025 | ADMINISTRATIVE v.1 | 12/30/2025 | REQUIRES RESUBMIT |
| 04/10/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 04/10/2026 | REQUIRES RESUBMIT |
| 11/17/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 12/12/2025 | REQUIRES RESUBMIT |
| 04/14/2026 | COMMERCIAL REVIEW - FULL REVISION v.2 | 05/08/2026 | APPROVED |
| 05/27/2026 | SPECIAL INSPECTION REVIEW v.1 | 05/29/2026 | APPROVED |
| 07/06/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/08/2026 | APPROVED |
| 05/20/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 05/21/2026 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0825-01553
Permit Status: Complete
Permit Description: EXISITNG BUILDING INTO A BARBERSHOP 6000.00
| Date | Description | Comments |
|---|---|---|
| 08/19/2025 | There are three unit numbers associated with this address. Please confirm unit number in the Project Data Project/Address on the construction plan. Please include a comment response letter in your next upload confirming the address revision to this permit application. Please note that only one address/building can be associated with this permit. An additional permit application will be required if your change in occupancy includes a second address/building. | |
| 12/01/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 09/08/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/28/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/19/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 12/01/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0825-01553
Permite Description: EXISITNG BUILDING INTO A BARBERSHOP 6000.00
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2026 | BULD - Electrical Clearance | N/A | Not Applicable | Duplicate inspection. 8/12/2026 |
| 08/06/2026 | COT - LCEL - Electrical Final | N/A | Not Ready | Missing panel schedule. Provide 3’ clearance at sub panel. cannot very second sub panel. Provide gfci receptacle at laundry area. Provide a shackle lock at water heater breaker. Secure seal tight at water heater. Gfci breaker shall be dedicated in bathrooms. Roof still needs to be inspected. 8/6/2026 |
| 08/21/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 8-21-26: not applicable. |
| 08/18/2026 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 8-18-26: lower grab bars at ADA restroom to 36 aff, lower restroom mirror to 40" to the reflective surface, flush control must be on accessible side, missing vertical grab bar, install ADA restroom signs adjacent to door-60" maximum, add insulation to hot copper line at water heater, a water sterilization report is required- submit report to the city for review/approval. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0825-01553
Permit Description: EXISITNG BUILDING INTO A BARBERSHOP 6000.00
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2026 | COT - LCPL - Rough Soil | Passed | 3-12-26: underground plumbing approved. Okay to backfill using shading materials. | |
| 03/19/2026 | COT - LCBU - Preslab | Passed | Saw cuts throughout. Dowels in place. Okay for concrete placement. 3/19/2026 | |
| 04/29/2026 | COT - LCEL - Electrical Above Ceiling | Passed | 4-29-26: electrical above ceiling approved. | |
| 04/29/2026 | COT - LCBU - Framing | Passed | 4-29-26: framing approved. | |
| 05/20/2026 | COT - LCPL - Plumbing Intermediate | Passed | 5-20-26: drywall screw inspection approved. Okay to tape & texture. | |
| 06/23/2026 | COT - LCME - Mechanical Intermediate | Passed | ||
| 07/09/2026 | COT - LCME - Mechanical Final | Passed | ||
| 08/13/2026 | COT - LCEL - Electrical Final | Passed | ||
| 08/13/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 08/18/2026 | COT - LCBU - Masonry Pregrout | Passed | 8-18-26: approved. | |
| 08/18/2026 | COT - LCPL - Yard Water Line | Passed | 8-18-26: approved. | |
| 08/21/2026 | COT - LCPL - Plumbing Final | Passed | 8-21-26: plumbing final approved. Contractor provided me with a copy of the water sterilization report and has submitted a copy to the city for review/approval. | |
| 08/25/2026 | COT - FCON - Fire - Final | Passed | ||
| 08/26/2026 | ENGR Engineering Final | Passed | ||
| 08/27/2026 | COT - LCBU - Building Final | Passed |