Permit: TC-COM-0523-01415
Permit Details
Apply Date:
05/31/2023
Applicant:
Description:
THIS PROJECT CONSISTS OF A TENANT IMPROVEMENT FOR A NEW BEYOND BREAD COMMISSARY KITCHEN / COMMERCIAL KITCHEN, CAFE SPACE WITH ITS OWN CAFE KITCHEN (2,082 SF TOTAL) NOT ASSOCIATED WITH THE COMMISSARY KITCHEN, AND SUPPORTING BREAK ROOM AND TWO OFFICES. EXTERIOR WALLS SHALL REMAIN, UPDATING EXISTING GLAZING AND INFILL WALLS ON THE WEST FACADE AND A NEW ENTRY VESTIBULE AT THE SOUTHEAST CORNER OF THE EXISTING BUILDING. THE BEYOND BREAD TENANT SHALL OCCUPY A MAJORITY OF THE EXISTING BUILDING PROVIDING TWO LEASE SPACE OPPORTUNITIES FOR FUTURE TENANT IMPROVEMENTS.
Permit Reviews
Permit Number - TC-COM-0523-01415
Permit Status: Issued
Permit Description: THIS PROJECT CONSISTS OF A TENANT IMPROVEMENT FOR A NEW BEYOND BREAD COMMISSARY KITCHEN / COMMERCIAL KITCHEN, CAFE SPACE WITH ITS OWN CAFE KITCHEN (2,082 SF TOTAL) NOT ASSOCIATED WITH THE COMMISSARY KITCHEN, AND SUPPORTING BREAK ROOM AND TWO OFFICES. EXTERIOR WALLS SHALL REMAIN, UPDATING EXISTING GLAZING AND INFILL WALLS ON THE WEST FACADE AND A NEW ENTRY VESTIBULE AT THE SOUTHEAST CORNER OF THE EXISTING BUILDING. THE BEYOND BREAD TENANT SHALL OCCUPY A MAJORITY OF THE EXISTING BUILDING PROVIDING TWO LEASE SPACE OPPORTUNITIES FOR FUTURE TENANT IMPROVEMENTS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/24/2024 | APPROVED |
| 06/01/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/30/2023 | REQUIRES RESUBMIT |
| 02/21/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 02/21/2025 | REQUIRES RESUBMIT |
| 04/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/23/2025 | APPROVED |
| 12/12/2023 | COMMERCIAL REVIEW - FULL v.4 | 12/13/2023 | APPROVED |
| 02/21/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 03/14/2025 | APPROVED |
| 04/29/2024 | COMMERCIAL REVIEW - FULL v.1 | 05/14/2024 | REQUIRES RESUBMIT |
| 11/03/2023 | COMMERCIAL REVIEW - FULL v.3 | 11/14/2023 | REQUIRES RESUBMIT |
| 06/17/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/20/2024 | APPROVED |
| 06/25/2024 | RESTAMP - COMMERCIAL v.2 | 06/25/2024 | APPROVED |
| 09/27/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/20/2023 | REQUIRES RESUBMIT |
| 04/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/30/2025 | APPROVED |
| 12/13/2023 | RESTAMP - COMMERCIAL v.1 | 12/13/2023 | APPROVED |
| 04/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | APPROVED |
| 06/20/2024 | RESTAMP - COMMERCIAL v.1 | 06/24/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0523-01415
Permit Status: Issued
Permit Description: THIS PROJECT CONSISTS OF A TENANT IMPROVEMENT FOR A NEW BEYOND BREAD COMMISSARY KITCHEN / COMMERCIAL KITCHEN, CAFE SPACE WITH ITS OWN CAFE KITCHEN (2,082 SF TOTAL) NOT ASSOCIATED WITH THE COMMISSARY KITCHEN, AND SUPPORTING BREAK ROOM AND TWO OFFICES. EXTERIOR WALLS SHALL REMAIN, UPDATING EXISTING GLAZING AND INFILL WALLS ON THE WEST FACADE AND A NEW ENTRY VESTIBULE AT THE SOUTHEAST CORNER OF THE EXISTING BUILDING. THE BEYOND BREAD TENANT SHALL OCCUPY A MAJORITY OF THE EXISTING BUILDING PROVIDING TWO LEASE SPACE OPPORTUNITIES FOR FUTURE TENANT IMPROVEMENTS.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/30/2025 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
Conditions
Permit Number - TC-COM-0523-01415
Permit Status: Issued
Permit Description: THIS PROJECT CONSISTS OF A TENANT IMPROVEMENT FOR A NEW BEYOND BREAD COMMISSARY KITCHEN / COMMERCIAL KITCHEN, CAFE SPACE WITH ITS OWN CAFE KITCHEN (2,082 SF TOTAL) NOT ASSOCIATED WITH THE COMMISSARY KITCHEN, AND SUPPORTING BREAK ROOM AND TWO OFFICES. EXTERIOR WALLS SHALL REMAIN, UPDATING EXISTING GLAZING AND INFILL WALLS ON THE WEST FACADE AND A NEW ENTRY VESTIBULE AT THE SOUTHEAST CORNER OF THE EXISTING BUILDING. THE BEYOND BREAD TENANT SHALL OCCUPY A MAJORITY OF THE EXISTING BUILDING PROVIDING TWO LEASE SPACE OPPORTUNITIES FOR FUTURE TENANT IMPROVEMENTS.
| Date | Description | Comments |
|---|---|---|
| 11/08/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 11/08/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/08/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/16/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 11/08/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 11/08/2023 | Masonry Inspection Report submittal review is required. | |
| 04/16/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/16/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 11/08/2023 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0523-01415
Permite Description: THIS PROJECT CONSISTS OF A TENANT IMPROVEMENT FOR A NEW BEYOND BREAD COMMISSARY KITCHEN / COMMERCIAL KITCHEN, CAFE SPACE WITH ITS OWN CAFE KITCHEN (2,082 SF TOTAL) NOT ASSOCIATED WITH THE COMMISSARY KITCHEN, AND SUPPORTING BREAK ROOM AND TWO OFFICES. EXTERIOR WALLS SHALL REMAIN, UPDATING EXISTING GLAZING AND INFILL WALLS ON THE WEST FACADE AND A NEW ENTRY VESTIBULE AT THE SOUTHEAST CORNER OF THE EXISTING BUILDING. THE BEYOND BREAD TENANT SHALL OCCUPY A MAJORITY OF THE EXISTING BUILDING PROVIDING TWO LEASE SPACE OPPORTUNITIES FOR FUTURE TENANT IMPROVEMENTS.
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Duct work in hard lids of Southwest bathrooms: duct system in soffit in Southwest portion of structure. |
| 11/07/2024 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | Domestic water lines throughout. Ok to insulate hot water lines. |
| 05/30/2024 | COT - HCBU - Building Progress | N/A | Partial Pass | Footings |
| 10/18/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Grease waste line from grease trap to main sewer connection at West side of building (4” lines), additional waste lines from building to main sewer line. Roof drains at West side of building (2 drains) to main,sewer line. Grease line is approximately 80 feet; Ok to cover progress areas. |
| 04/21/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0523-01415
Permit Description: THIS PROJECT CONSISTS OF A TENANT IMPROVEMENT FOR A NEW BEYOND BREAD COMMISSARY KITCHEN / COMMERCIAL KITCHEN, CAFE SPACE WITH ITS OWN CAFE KITCHEN (2,082 SF TOTAL) NOT ASSOCIATED WITH THE COMMISSARY KITCHEN, AND SUPPORTING BREAK ROOM AND TWO OFFICES. EXTERIOR WALLS SHALL REMAIN, UPDATING EXISTING GLAZING AND INFILL WALLS ON THE WEST FACADE AND A NEW ENTRY VESTIBULE AT THE SOUTHEAST CORNER OF THE EXISTING BUILDING. THE BEYOND BREAD TENANT SHALL OCCUPY A MAJORITY OF THE EXISTING BUILDING PROVIDING TWO LEASE SPACE OPPORTUNITIES FOR FUTURE TENANT IMPROVEMENTS.
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2024 | COT - HCPL - Plumbing Intermediate | Passed | In wall plumbing; Ok to insulate and cover walls | |
| 09/18/2024 | COT - HCEL - Electrical Intermediate | Passed | In wall electric; OK to insulate and cover walls. | |
| 10/09/2024 | COT - HCBU - Framing | Passed | Ok to insulate and cover walls. | |
| 10/09/2024 | COT - HCBU - Roof Nailing | Passed | ||
| 01/27/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 01/27/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | Ok to set ceiling tiles in progress areas. | |
| 04/02/2025 | BULD - Electrical Clearance | Passed | Approved service panel for new meter - ECO Clearance to TEP is required for panel "HP" (existing service meter "Beyond Bread is active) |
|
| 04/02/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Approved canopy footings (REV 2), okay for concrete placement | |
| 04/15/2025 | COT - HCBU - Building Progress | Passed | Canopy over main entry area. | |
| 04/21/2025 | COT - FCON - Hood System - Final | Passed | ||
| 04/21/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 04/21/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 04/21/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 04/21/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 04/21/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/22/2025 | COT - FCON - Alarm - Final | Passed | ||
| 04/24/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 04/23/2025 | COT - HCBU - Building Final | Passed | OK to make application for Certificate of Occupancy. | |
| 04/23/2025 | COT - HCEL - Electrical Final | Passed | ||
| 04/23/2025 | COT - HCME - Mechanical Final | Passed | ||
| 04/23/2025 | ENGR Engineering Final | Passed | CO READY | |
| 04/24/2025 | COT - FCON - Fire - Final | Passed |