Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2025 | ENGR Engineering Final | Not Ready | Gutter at front door. Rails at 42" in the locations we noted. Finish the cable on the front rails. Add the ADA parking signs. Finish installing the front walkway lights. Paint the leading edge of the loading dock areas safety yellow. |
|
| 04/23/2025 | ENGR Engineering Final | Passed | CO READY |