Inspection Status: Passed
Inspection History: COT - HCPL - Plumbing Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 04/21/2025 |
COT - HCPL - Plumbing Progress |
|
Passed |
|
| 06/12/2024 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
Interior underground plumbing, waste and vent lines throughout. Ok to cover progress areas. Inspection to include pre-slab inspection for walk-in coolers. Ok to place concrete in progress areas. Electric underground at 14 1” and 3/4” conduits at Southwest portion of building. Ok to cover progress areas. |
| 06/26/2024 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
Plumbing in slab, wrapping in place. Ok to place concrete in progress areas. |
| 09/09/2024 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
Grease interceptor installed, need to install rings and caps at finish grade level. Ok to cover progress areas. |
| 10/09/2024 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
Rain leaders (4), on west side of building |
| 10/18/2024 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
Grease waste line from grease trap to main sewer connection at West side of building (4” lines), additional waste lines from building to main sewer line. Roof drains at West side of building (2 drains) to main,sewer line. Grease line is approximately 80 feet; Ok to cover progress areas. |
| 10/23/2024 |
COT - HCPL - Plumbing Progress |
|
Partial Pass |
Grease line completed to main sewer line, approximately 50’ added to complete the connection. |