Permit Details

Status:
Fees Paid
Type:
Commercial Building
Address NEW:
980 W IRVINGTON RD
Apply Date:
03/14/2025
Applicant:
John Krawietz
Description:
New, ground up construction of a 3-story self storage facility

Permit Reviews

Permit Number - TC-COM-0325-00501
Permit Status: Fees paid
Permit Description: New, ground up construction of a 3-story self storage facility
Start Date Submittal Complete Date Status  
08/17/2026 SPECIAL INSPECTION REVIEW v.1 N/A IN REVIEW Review Details
02/02/2026 ADMINISTRATIVE v.1 02/02/2026 REQUIRES RESUBMIT Review Details
03/19/2025 COMMERCIAL REVIEW - FULL v.2 04/15/2025 REQUIRES RESUBMIT Review Details
01/06/2026 COMMERCIAL REVIEW - FULL v.5 01/16/2026 APPROVED Review Details
01/30/2026 COMMERCIAL REVIEW - LIMITED v.2 02/02/2026 APPROVED Review Details
12/09/2025 COMMERCIAL REVIEW - FULL v.4 12/31/2025 REQUIRES RESUBMIT Review Details
09/22/2025 COMMERCIAL REVIEW - FULL v.3 10/16/2025 REQUIRES RESUBMIT Review Details
01/21/2026 COMMERCIAL REVIEW - LIMITED v.1 01/21/2026 REQUIRES RESUBMIT Review Details
07/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/29/2026 APPROVED Review Details
01/16/2026 RESTAMP - COMMERCIAL v.1 01/21/2026 APPROVED Review Details
03/18/2025 COMMERCIAL REVIEW - FULL v.1 03/18/2025 REQUIRES RESUBMIT Review Details
08/06/2026 COMMERCIAL REVIEW - FULL REVISION v.1 08/07/2026 APPROVED Review Details
06/22/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/07/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0325-00501
Permit Status: Fees paid
Permit Description: New, ground up construction of a 3-story self storage facility
Total Outstanding Activity Conditions - 19
Date Name
01/09/2026 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
11/21/2025 AIR BALANCING REPORT IS REQUIRED.
11/21/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
11/21/2025 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
11/21/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
11/21/2025 COMMISSIONING REPORT IS REQUIRED.
11/21/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/21/2025 Elevator Designs must be submitted and approved prior to ...
11/21/2025 ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
11/21/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/21/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
11/21/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
11/21/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
11/21/2025 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
11/21/2025 Post-Installed Anchor Inspection Report is required.
11/21/2025 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
11/21/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
11/21/2025 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.
12/29/2025 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0325-00501
Permit Status: Fees paid
Permit Description: New, ground up construction of a 3-story self storage facility
Date Description Comments
03/18/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/13/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/06/2025 Prior to project being finalized applicant must provide proof of recordation of abandonment of 16' electrical easement.

Outstanding Inspections

Permit Status: Fees Paid
Permit Number: TC-COM-0325-00501
Permite Description: New, ground up construction of a 3-story self storage facility
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
03/25/2026 COT - HCPL - Sewer N/A Partial Pass 3-25-26: verified sewer test at 4psi on a 31' run with a 4" SDR 35 PVC line. Per IPC 306.2.4., a tracer wire for all plastic sewer piping is required.
05/15/2026 COT - HCBU - Roof Nailing N/A Partial Pass 5-15-26: Roof nailing /reinforcement at metal roof decking verified per S3.1-second floor slab notes 1-6 & S1.1/decking/material note #7 & roof installation, notes #2. Okay for concrete placement at progress areas.
04/07/2026 COT - HCBU - Preslab N/A Partial Pass 4-7-26: excavation/Reinforcement on 4 interior footings verified per footing schedule F30, F45-G/L 21/ D-L, F60-G/L31/C-D, reinforcement/excavation for remaining exterior footings from G/L 33-West to D and north from G/L H -27 verified per footing schedule F30, F35, F45 and S2.1, details 101. Okay for concrete placement at progress areas.
08/05/2026 COT - HCBU - Framing N/A Partial Pass Partial pass. 3rd floor framing approved per third party reports. 8/5/2026
08/05/2026 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass Insulation inspection not required. 8/5/2026
08/06/2026 COT - HCME - Mechanical Progress N/A Partial Pass Partial pass. Units hung 1st and 2nd floors. Provide documentation on units for pan requirements along with specs on over flow devices. Re inspection required once duct is in place. 8/6/2026
04/07/2026 COT - HCPL - Plumbing Progress N/A Partial Pass 4-7-26: 1" domestic verified under test at 126 psi near fire pump together with a 3" underground plumbing drain from sump pump at elevator pit at G/L- C-D/1-9. Okay to backfill approximately 85' of trench using shading materials.
04/07/2026 COT - HCEL - Electrical Progress N/A Partial Pass 4-7-26: verified 15-1" schedule 40 conduits at sump/elevator shaft, 7-3/4" secondary conduits on west end running north to south for lighting/hvac 2nd floor, and additional conduits consisting of 1" & 3/4" conduits for p1, m1, p2, lp1 at south side of site. Okay to backfill progress areas using shading materials.
08/14/2026 COT - HCEL - Electrical Above Ceiling N/A Partial Pass 8/14/2026 Partial pass. 1st floor both bathrooms, break room, front office and data room approved for in walls and above rough in’s.
08/17/2026 BULD - Electrical Clearance N/A Partial Pass Partial pass. Clearance to TEP TMPP. 8/17/2026

Documents

File Name Document Type  
E1.1 - ELECTRICAL SITE PLAN_UPDATED 7.22.26_V1.PDF DOCUMENTS VIEW
CANOPY CALCULATIONS_V1.PDF DOCUMENTS VIEW
TC-COM-0325-00501 STAIR AND LADDER CALCULATIONS_V1.PDF DOCUMENTS VIEW
TC-COM-0325-00501 STAIR SHOP DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-CONS-TUCSON SELF STORAGE - COMBINED DRAWING SET W CALCS_V3_V3.PDF DOCUMENTS VIEW
CONS-SS TUCSON AZ_MECHANICAL REV 4_V4.PDF DOCUMENTS VIEW
CONS-TUCSON SELF STORAGE - ELEC - REV 5_V5.PDF DOCUMENTS VIEW
SPEEDIE - TUCSON SELF STORAGE - INITIAL SIC-2025-12-15_V1.PDF DOCUMENTS VIEW