Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - HCPL - Sewer
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2026 | COT - HCPL - Sewer | Partial Pass | 3-23-26: sewer tap on a 4" SDR 35 pvc. Okay to backfill approximately 30' of open trench using shading materials. Note: sewer test will be conducted at later date. |
|
| 03/25/2026 | COT - HCPL - Sewer | Partial Pass | 3-25-26: verified sewer test at 4psi on a 31' run with a 4" SDR 35 PVC line. Per IPC 306.2.4., a tracer wire for all plastic sewer piping is required. | |
| 04/13/2026 | COT - HCPL - Sewer | Partial Pass | 4-13-26: verified sewer tracer wire. Okay to continue with construction at progress areas. |