Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 08/07/2026 |
BULD - Electrical Clearance |
|
Re-inspection required |
8-7-26: either replace receptacles at MDP with weather resistant receptacles or make them obsolete and install a weather resistant gfci with a bubble cover at temp main. |
| 08/13/2026 |
BULD - Electrical Clearance |
|
Not Ready |
Conduit shall be buried at a minimum of 18" for any physical damage. Provide torque report at next site visit. 8/13/2026 |
| 08/17/2026 |
BULD - Electrical Clearance |
|
Partial Pass |
Partial pass. Clearance to TEP TMPP. 8/17/2026 |