Permit Number: TC-COM-0325-00501
Parcel: 120052770

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - TC-COM-0325-00501
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
12/22/2025 Commercial Building Standard APPROVED Structural (S) Reviewer (from previous submittal TUC9685001.092225)
Madeline Nelson; mnelson@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 9/25/2025

Building (B) Reviewer (from previous submittal TUC9685001.092225)
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Approved As Is
Date Completed: 9/23/2025
12/29/2025 Water - PDSD Standard APPROVED
12/31/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
12/15/2025 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical (M) Reviewer
Jorge Valido; jvalido@safebuilt.com
Discipline Status:Denied
Date Completed: 12/10/2025
1.(UNRESOLVED) - General -Provide Heat Load Calculations - 2018 IECC Section C403.1.1 Calculation of heating
and cooling loads.
i.Heat load Summary submitted for review shows 29 tons / Total coil load 347.7 MBH. It also shows Sensible
Coil Load 347.7 MBH. Is there no Latent Load?
▪Design load on plan sheet M5.0 shows 751.4 MBH (659.6 Sensible 91.8 MBH Latent). Design is twice
the amount shown on Heat Load Calculations. Confirm Heat load calculations and design. - 2018 IECC -
C403.3.1 Equipment sizing (Mandatory).-2018 IECC Section C103.2Information on construction
documents. - 2018 IBC Section [A]107.2.1Information on construction documents.
Review done on 12/10/2025
1.No corrections or clarification made.
•Design load on plan sheet M5.0 shows (17) systems with 44.2 MBH each = total 751.4 MBH. Submitted Air System
Sizing Summary for Block Load form states Total coil load is 347.7 MBH. Design is twice the amount shown on Heat
Load Calculations. 2018 IECC Section C403.3.1 Equipment sizing (Mandatory).requires commercial heating and
cooling equipment to be sized as close as possible to the actual building loads, not exceeding the smallest available
unit size that still meets those calculated needs. Confirm Heat load calculations and design.-2018 IECC Section
C103.2Information on construction documents. - 2018 IBC Section [A]107.2.1Information on construction documents.
12/15/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing (P) Reviewer
Perry Hendershott; phendershott@safebuilt.com
Discipline Status:Denied
Date Completed: 12/14/2025
Copy to clipbTHIRD PLUMBING REVIEW: COMMENT 2 REMAINS
RESOLVED--1).General:Address building plan review comment 2. Bldg comment 2 could affect fixture count.-2018 IPC
403.1
UNRESOLVED-2). Plan Page A0.70:Incorrect fixture count & plumbing code listed. Fixture counts need to derive from-2018
IPC 403.1which equate to 4 male & 4 female toilets and 3 Female lavatories & 3 male lavatories .
RESOLVED-3).Plan Page A0.10:Missing a complete sheet index. Update sheet index to correlate with all the plan sheets
provided-2018 IPC 106.3.1
RESOLVED-4). Plan page P4.0:Missing enlarged sanitary & water details that correlate to each floor level. Add enlarged
sanitary & water details that correlate to each floor level-2018 IPC 106.3.1
RESOLVED-5). Plan Page P2.4: Missing GPM loads next to each set of Roof drains. Add GPM loads next to each set of
Roof drains.-2018 IPC 1106.2
RESOLVED-5).Plan Page P6.0 Water riser diagram:Missing riser continuation that illustrates all floor levels. Add riser
continuation that illustrates all floor levels.-2018 IPC 106.3.1
RESOLVED-6).Plan Page P6.1 Sanitary riser diagram:Missing riser continuation that illustrates all floor levels. Add riser
continuation that illustrates all floor levels.-2018 IPC 106.3.1
RESOLVED-7).Plan page P4.0:Missing correct fixture identifier for P5 service sink and missing water heater location. Add
correct fixture identifier for P5 service sink and show water heater location.-2018 IPC 106.3.1
12/31/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Krista Hansen
Planning & Development Services Department – Zoning Review Section

PROJECT: TC-COM-0325-00501 - TD-DEV-1224-00333
980 W IRVINGTON RD – C-1
Personal Storage (3rd Review)

TRANSMITTAL DATE: 12/31/2025


This site is located in the C-2 zone (UDC 4.7.21). Personal Storage is an approved use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.10.C.3 & .6.


01. COMMENT: Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-1224-00333 and although it appears that the building plans match the DP, until the DP is approved by all review agencies, Zoning cannot approve this building permit.


For questions regarding Zoning comments, please contact me at: Krista.Hansen@tucsonaz.gov
12/09/2025 PDSD Application Completeness Express REVIEW COMPLETED Previous construction plan was placed back into review along with Building Official Appeal letter.
Special inspection documents added 12/16