Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
03/08/2024
Applicant:
Dennis Caldwell
Description:
a tenant finish for an existing one story single sided dock warehouse / distribution building

Permit Reviews

Permit Number - TC-COM-0324-00430
Permit Status: Complete
Permit Description: a tenant finish for an existing one story single sided dock warehouse / distribution building
Start Date Submittal Complete Date Status  
04/19/2024 COMMERCIAL REVIEW - FULL v.2 05/09/2024 APPROVED Review Details
10/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/02/2024 APPROVED Review Details
02/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/24/2025 APPROVED Review Details
05/09/2024 RESTAMP - COMMERCIAL v.1 05/13/2024 APPROVED Review Details
10/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/21/2024 APPROVED Review Details
05/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/30/2024 APPROVED Review Details
12/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2024 REQUIRES RESUBMIT Review Details
10/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/14/2024 REQUIRES RESUBMIT Review Details
03/14/2024 COMMERCIAL REVIEW - FULL v.1 04/16/2024 REQUIRES RESUBMIT Review Details
12/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0324-00430
Permit Status: Complete
Permit Description: a tenant finish for an existing one story single sided dock warehouse / distribution building
Date Description Comments
10/18/2024 SPECIAL INSPECTION FOR ANCHOR BOLTS INSTALLED AT RACKS IS REQUIRED.
05/30/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
10/02/2024 A portion of the building is exempt from the building thermal envelope requirements set forth in C402.1 per the following: 1. C402.1.1 Low-energy buildings exceptions #3 and #4 (City of Tucson Amendment to 2018 IECC). This S-1 Occupancy Group portion of the building has a peak design rate of energy of 0.094 W/sqft < 1.0 W/sqft. 2. The “B” Occupancy Group is separated from the Warehouse “S-1” Occupancy Group with a 6” metal framed wall insulated with R-19 batt insulation. Above roof deck insulation value is R-38. Both conditions exceed the minimum insulation R-value requirements.
05/30/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/14/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/30/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/30/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/18/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
05/30/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
05/30/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
10/18/2024 SPECIAL INSPECTION FOR SPECIAL STEEL FRAMES AND STEEL DECKING IS REQUIRED.
10/18/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0324-00430
Permite Description: a tenant finish for an existing one story single sided dock warehouse / distribution building
Total Outstanding Inspections - 10
Last Inspection Date Description Inspector Results Comments
07/10/2024 COT - HCBU - Masonry Pregrout N/A Partial Pass Elevator shaft 7’4 lift. Grid line: 18A-18B/A-A1. #5 vertical per plan and ladder ties at every other course. Okay to grout. 7/9/2024
7/10/24: 3rd lift at elevator shaft reinforcement per plan. Third party inspection report attached under attachments. Ok to grout progress areas.
11/22/2024 COT - BULD - SWG Clearance N/A Not Applicable
06/27/2024 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass Total of 12 footers. 9 of them are on page S1.1 detail 9. The other four are scab footings page S1.1 detail 1. Elevator pit. Page S1.1 detail 7. Two pier footings in elevator pit. Page S1.1 detail 12. Approved by third party inspector. Okay to proceed progress areas. 6/27/2024
10/08/2024 COT - HCBU - Framing N/A Partial Pass 9/27/25: framing at first floor office area passed.
10/8/24: framing at second floor passed ok to proceed.
10/08/2024 COT - HCEL - Electrical Above Ceiling N/A Partial Pass Both bathrooms #133&#134 okay for hard lids. 7/17/2024
9/27/24: electrical above ceiling at first floor hard lid area at office per plan ok to proceed
Both bathrooms #133&#134 okay for hard lids. 7/17/2024
10/8/24: above ceiling in rooms 202,206,207,207A,207B ok to proceed.
10/08/2024 COT - HCEL - Electrical Intermediate N/A Partial Pass 7/16/2024: Driver entrance (#130), open office (#131), hallway (132), and both bathrooms (#133&#134). Okay to proceed progress areas.

Electrical underground for reception desk. Both bathrooms(#133&#134) okay for hard lids. 7/17/2024
9/27/24: Electrical in wall and above ceiling at hard lid areas passed at first floor office area.
10/8/24: Electrical in wall and above ceiling at hard lid areas passed at second floor area ok to proceed.
10/08/2024 COT - HCPL - Plumbing Intermediate N/A Partial Pass 7/1/24: plumbing underground partial pass at bathrooms in warehouse area rooms 133 and 134.

7/16/2024: both bathroom numbers #133 and #134 on test. Okay to proceed progress areas.

Sand separator and plumbing connection to it and to the main on test. Okay to backfill. Shading required. 7/17/2024

7/19/24: plumbing underground at office area passed ok to proceed with backfill. Shading required

9/17/2024 Partial pass. In wall plumbing for room numbers 103,105,106,107,116, and 117. Okay to proceed progress areas.
10/8/24: plumbing intermediate at rooms 202,206,207,207A,207B passed ok to proceed.
10/08/2024 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass Both bathrooms #133&#134 okay for hard lids. 7/17/2024
10/8/24: above ceiling in rooms 202,206,207,207A,207B ok to proceed.
10/15/2024 COT - FCON - Fire - Final N/A Partial Pass ok for temp c of o. for the warehouse and bathrooms. level 2.
02/12/2025 COT - HCBU - Building Final N/A Re-inspection required 2-12-25, flush valve must be installed on accessible side of water closet-1st floor woman's bathroom

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0324-00430
Permit Description: a tenant finish for an existing one story single sided dock warehouse / distribution building
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/12/2024 COT - HCBU - Masonry Pregrout Passed Elevator shaft 7’4 lift. Grid line: 18A-18B/A-A1. #5 vertical per plan and ladder ties at every other course. Okay to grout. 7/9/2024
7/10/24: 3rd lift at elevator shaft reinforcement per plan. Third party inspection report attached under attachments. Ok to grout progress areas.
7/11/24: 4th lift at elevator shaft reinforcement per plan, third party inspection report approved. Ok to proceed
7/12/24: top out passed reinforcement per plan ok to grout.
09/16/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. UNIT #110. 9/16/2024
09/16/2024 COT - HCBU - Preslab Passed
10/15/2024 COT - FCON - Sprinkler - Final Passed
11/22/2024 COT - LCBU - Excavation/Rebar/Zoning Passed
11/22/2024 TRSP - ROW - Final/Close-Out Passed no impact to right of way, site completed
11/22/2024 COT - HCBU - Framing Passed
11/22/2024 COT - HCEL - Electrical Intermediate Passed
11/22/2024 COT - HCME - Mechanical Intermediate Passed
11/22/2024 COT - HCPL - Plumbing Intermediate Passed
11/22/2024 COT - HCPL - Rough Soil Passed
12/05/2024 COT - HCME - Mechanical Above Ceiling Passed
12/05/2024 COT - HCPL - Plumbing Above Ceiling Passed
12/05/2024 COT - HCBU - Building Above Ceiling Passed
12/04/2024 COT - SITE - Zoning Intermediate Passed No zoning issues observed
02/07/2025 COT - FCON - Alarm - Final Passed
02/11/2025 COT - FCON - Fire - Final Passed
02/12/2025 ENGR Engineering Final Passed No exterior work completed here
02/12/2025 COT - HCEL - Electrical Final Passed 2-12-25, electrical final approved.
02/12/2025 COT - HCME - Mechanical Final Passed 2-12-25, mechanical final approved.
02/13/2025 COT - HCBU - Building Final Passed 2-13-25, building final approved.
02/13/2025 COT - HCPL - Plumbing Final Passed 2-13-25, plumbing final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
AIR BALANCE_V1.PDF DOCUMENTS VIEW
CATALINA MECH. - ILS CHLORINATION REPORT-2024-12-06_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
2024-10-15 S.I. CERT AND ILS TI FINAL REPORT PACKET-2024-10-15_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
2024-09-26 TUCSON SI CERT, ILS TI RACKING FINAL REPORT-2024-09-26_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
S.I. CERT, ILS COMPANY TI-SIGNED-2024-05-29_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
S.I. CERT, ILS COMPANY TI-SIGNED-2024-05-29_V1.PDF DOCUMENTS VIEW
CONS-21180_06 ILS PERMIT SETR1 04-17-2024_V2.PDF DOCUMENTS VIEW
21180-06 _ ADDENDUM 01 2024-04-17_V1.PDF DOCUMENTS VIEW
21180-06 _ ADDENDUM 01 2024-04-17_V1.PDF DOCUMENTS VIEW
CONS-21180_06 ILS PERMIT SETR1 04-17-2024_V2.PDF DOCUMENTS VIEW