Inspection Status: Partial Pass
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
Permit Number - TC-COM-0324-00430
Inspection Description - COT - LCBU - Excavation/Rebar/Zoning
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/27/2024 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | Total of 12 footers. 9 of them are on page S1.1 detail 9. The other four are scab footings page S1.1 detail 1. Elevator pit. Page S1.1 detail 7. Two pier footings in elevator pit. Page S1.1 detail 12. Approved by third party inspector. Okay to proceed progress areas. 6/27/2024 | |
07/02/2024 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | Total of 12 footers. 9 of them are on page S1.1 detail 9. The other four are scab footings page S1.1 detail 1. Elevator pit. Page S1.1 detail 7. Two pier footings in elevator pit. Page S1.1 detail 12. Approved by third party inspector. Okay to proceed progress areas. 6/27/2024 7/1/24: not ready 7/2/24: reinforcement per plan at pour back at rooms (130,131,132,133,134), elevator concrete wall reinforced per plan ok to proceed. |
|
07/26/2024 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | 7/26/2024 : reinforcement per plan at underground for reception desk, Sand separator and Mezzanine main office bathrooms. Okay for concrete placement. | |
08/12/2024 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | 8/12/2024 mezzanine decking reinforcement per plan. Okay for concrete placement in slab. | |
08/14/2024 | COT - LCBU - Excavation/Rebar/Zoning | Partial Pass | Footings for columns: grid line A4/18C, A1/18C, A5/18C, A/17D. Beam bearing at tilt up wall. Grid line A/18A. Approved per special inspection. (Third party) 8/14/2024 |