Inspection Status: Re-inspection required

Inspection History: COT - HCBU - Building Final 

Date Description Inspector Results Comments
02/12/2025 COT - HCBU - Building Final  Re-inspection required 2-12-25, flush valve must be installed on accessible side of water closet-1st floor woman's bathroom
02/13/2025 COT - HCBU - Building Final  Passed 2-13-25, building final approved.
09/11/2024 COT - HCBU - Building Final  Partial Pass Partial pass okay for level 2 for warehouse with racking, driver entrance #130, office room #131 both bathrooms #134 and #133. Barriers around mezzanine area that is still under construction. 9/11/2024
COT - HCBU - Building Final  Not Ready Partial pass okay for level 2 for warehouse with racking, driver entrance #130, office room #131 both bathrooms #134 and #133. Barriers around mezzanine area that is still under construction. 9/11/2024
11/25/24: verify over flow switch at air handlers,
12/06/2024 COT - HCBU - Building Final  Partial Pass Partial pass okay for level 2 for warehouse with racking, driver entrance #130, office room #131 both bathrooms #134 and #133. Barriers around mezzanine area that is still under construction. 9/11/2024
11/25/24: verify over flow switch at air handlers,
12/6/24: ok for LEVEL 1 TCO office area, pending (bathrooms,elevator, roof inspection on equipment, glazing)