Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 3780 E VALENCIA RD
Search
Annexations & Original City Zoning (OCZ)
Address: 3780 E VALENCIA RD
Date - 11/13/2024 4:14 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/13/2024 4:14 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-03-19 | Jacome - Valencia Road and Alv | C-1 | Expired | 05/17/2006 |
Permits
Address: 3780 E VALENCIA RD
Date - 11/13/2024 4:14 a.m.
Total Number Of Permits - (36)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TC-COM-1222-00335 | Issued | 12/20/2022 | 06/18/2023 | Commercial Building | Providing temporary power to a construction site using a 400AMP single phase 240V system via overhead wire. | |
TF-FCP-1222-00216 | Complete | 12/20/2022 | 12/17/2023 | Fire Construction Permit | Provide 8 complete wet-pipe sprinkler system and 1,500 GPM electric fire pump | |
TC-CFO-1124-00224 | Complete | 11/07/2024 | N/A | UNIT 110 | Certificate of Occupancy | PLEASE PAY TCO EXTENSION UNDER TC-CFO-1024-00212. WHEN REQUESTING PLEASE DO NOT START A NEW REQUEST. IF ANOTHER EXTENSION IS NEEDED REQUEST EXTENSION UNDER TC-CFO-1024-00212 a tenant finish for an existing one story single sided dock warehouse / distribution building |
TC-CFO-1024-00212 | Fees Paid | 10/15/2024 | 11/15/2024 | UNIT 110 | Certificate of Occupancy | a tenant finish for an existing one story single sided dock warehouse / distribution building |
TZ-CMP-1023-00188 | Complete | 10/10/2023 | N/A | Zoning Compliance | Applicant is is currently constructing its redevelopment of the subject property to include over 700,000 square feet of new Class A industrial development (the “Project”). The Project consists of three industrial buildings which are expected to attract a wide range of industrial, technology, manufacturing and logistics companies. Please note we would like this letter to contain affirmative language stating the following: 1. That the Property is located within the I-1 (Light Industrial) zoning classification; 2. The permitted uses thereunder, with specific confirmation that the use of the Property and structures located thereon (if any) is allowed under the current zoning; 3. That there is compliance with respect to (as applicable): a. Area, width, and depth of the land as a building site for the structures; b. Floor space area for the structures; c. Setback of said structure from property lines; d. Height of said structures; and e. Sufficient parking spaces. 4. That all conditions have been satisfied and an occupancy permit has been issued (if applicable); 5. That the Property is in compliance with all applicable subdivision, ordinances and regulations; and 6. Permitted uses under the current zoning, without the necessity of obtaining a rezoning, conditional use permit or variance, includes, but is not limited to: a. Receiving, storing, assembling, shipping, distributing, preparing, and selling products, materials, food, grocery and liquor items; b. The parking (including tandem parking), storage, and use (including driving into and through the building for loading and unloading and parking inside the building) of automobiles, trucks, machinery and trailers, including outdoor loading and unloading; c. Warehouse and office use; d. Using, handling or storing hazardous materials in accordance with applicable law and in the ordinary course of business, including (i) in any packaged merchandise to be sold, handled, and/or held for shipment to customers, (ii) maintenance of trucks and machinery, and (iii) batteries for any trucks, generators or other machinery or the equipment described in clause (e); e. Installing and operating rooftop equipment such as satellite dishes, cellular antenna, and renewable energy systems, including solar energy systems and related equipment; f. Installing and operating battery storage systems, and electrical generators; and g. Ancillary and related uses for any of the foregoing, all on a twenty-four-hour, seven-days-per-week, fifty-two-weeks-per-year basis. | |
TC-CFO-1024-00210 | Denied | 10/09/2024 | N/A | UNIT 110 | Certificate of Occupancy | This project still needs the okay from Fire inspector and level for Temporary Certificate of Occupancy. Please schedule Fire Final. Once you get the okay from Fire inspector please re-request Temporary Certificate of Occupancy. a tenant finish for an existing one story single sided dock warehouse / distribution building |
TC-COM-1023-02375 | Complete | 10/09/2023 | 04/20/2025 | UNIT 190 | Commercial Building | THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |
TC-CFO-0924-00198 | Issued | 09/13/2024 | 11/20/2024 | UNIT 190 | Certificate of Occupancy | PLEASE REQUEST FUTURE C OF O EXTENSIONS UNDER THIS REQUEST TC-CFO-0924-00198. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |
TC-CFO-0824-00183 | Complete | 08/29/2024 | 10/20/2024 | UNIT 190 | Certificate of Occupancy | THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |
TF-FCP-0824-00725 | Void | 08/29/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0424-00328 - Install New Line for protection of warehouse conveyor. | |
TF-FCP-0824-00727 | Void | 08/29/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0424-00328 - Install New Line for protection of warehouse conveyor | |
TD-DEV-0824-00237 | Inspections Complete | 08/19/2024 | 10/11/2027 | Development Package | Site development package related to TI permit # TC-COM-1023-02375. This package covers the modifications to the site including adding some prefabricated ramps, smokers, shelter, paint markings / graphics, and site signage throughout. | |
TC-CFO-0824-00171 | Complete | 08/16/2024 | 10/20/2024 | UNIT 190 | Certificate of Occupancy | THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |
TF-FCP-0724-00597 | Inspections | 07/24/2024 | 02/14/2025 | UNIT 110 | Fire Construction Permit | fire sprinkler TI and mezzanine |
TF-FOP-0724-00792 | Complete | 07/17/2024 | 10/01/2025 | UNIT 110 | Fire Operational Permit | Racking High Piled Storage Permit |
TF-FCP-0724-00551 | Complete | 07/11/2024 | 02/06/2025 | UNIT 110 | Fire Construction Permit | New fire alarm system. |
TS-PRM-0724-00316 | Issued | 07/11/2024 | 01/07/2025 | UNIT 110 | Sign - Permanent | Install one lighted wall sign |
TF-FCP-0724-00543 | Complete | 07/09/2024 | 01/18/2025 | Fire Construction Permit | EXPEDITE - ERRCS System | |
TF-FCP-0724-00547 | Void | 07/09/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0724-00543 - ERRCS SYstem | |
T22CM04001 | Complete | 05/25/2022 | 07/14/2024 | Commercial Building | Shell Bldg. | |
TF-FCP-0524-00357 | Complete | 05/07/2024 | 11/14/2024 | Fire Construction Permit | Expedite. New Fire Alarm. | |
TF-FCP-0523-00671 | Complete | 05/05/2023 | N/A | Fire Construction Permit | New underground fire line service into 259,274 sqft warehouse building | |
TC-COM-0424-00755 | Complete | 04/30/2024 | 03/09/2025 | UNIT 190 | Commercial Building | Free Standing Rack |
TF-FCP-0424-00328 | Complete | 04/25/2024 | 05/21/2025 | Fire Construction Permit | DOUBLE EXPEDITE - MODIFY FIRE SPRINKLER SYSTEM IN WAREHOUSE TO NEW OFFICE AND TO DRY CANOPY. | |
DP22-0100 | Complete | 04/21/2022 | 06/24/2027 | Development Package | Site/Grading: Tucson Commerce Center (NORTH side of Rodeo Wash). Three industrial warehouses. | |
TC-COM-0424-00570 | Complete | 04/01/2024 | 03/31/2025 | Commercial Building | conveyor belt plans with electrical connections for electrical permit | |
TR-UTL-0324-00614 | Issued | 03/26/2024 | 05/17/2024 | Right-of-Way (ROW) - Utility | P.208268 - Access of ex MH 18211 for splicing, replace (1) TR-UTL-1123-02870 Ped, place (1) new HH, dig (2) pits and bore 437' -- (Continuation of Expired 1/16/2024 - Permit TR-UTL-1123-02870) | |
TC-COM-0324-00430 | Issued | 03/08/2024 | 04/19/2025 | UNIT 110 | Commercial Building | a tenant finish for an existing one story single sided dock warehouse / distribution building |
TC-COM-0224-00259 | Issued | 02/08/2024 | 02/16/2025 | Commercial Building | New meter, associated with TC-COM-0124-00106. Additional permit required per JG | |
TC-CFO-0124-00025 | Complete | 01/18/2024 | 03/02/2024 | Certificate of Occupancy | new construction for a 1 story warehouse distribution building. | |
TC-COM-0124-00106 | Issued | 01/17/2024 | 03/26/2025 | Commercial Building | New TEP transformer and a 4000amp SES install and East electrical service relocate | |
T16RW00311 | FINAL | 07/05/2016 | 12/12/2016 | ROW | INSTALLATION OF NEW HAWK CROSSWALK ALONG WITH 4 NEW HANDICAP RAMPS AT EACH CORNER OF INTERSECTION, ALL PER U-2015-018 | |
T16RW02794 | EXPIRED | 11/17/2016 | 12/16/2016 | ROW | ACCESSING MANHOLES; SEWER REHABILITATION NO EXCAVATION ADDRESS ON APPLICATION: 3556 E VALENCIA | |
T18RW02426 | FINAL | 05/30/2018 | 06/29/2018 | ROW | N.345029 - PART TWO WORK SCOPE: CENTURYLINK REQUESTS PERMISSION TO ACCESS MANHOLE #18916 FOR FIBER OPTIC, BORE AND PLACE HAND HOLE. | |
T18RW02654 | FINAL | 06/13/2018 | 07/25/2018 | ROW | TEP TO REPLACE POLE, NO SIDEWALK | |
T18RW04458 | FINAL | 10/03/2018 | 04/14/2019 | ROW | WO 6228030 TEP TO REPLACE POLE, NO SIDEWALK |
Plans
Address: 3780 E VALENCIA RD
Date - 11/13/2024 4:14 a.m.
Total Number Of Plans - (7)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CWH-22-0100 | Active | 04/21/2022 | 04/21/2023 | -- Commercial Water Harvesting Ordinance | Site/Grading: Tucson Commerce Center (NORTH side of Rodeo Wash). Three industrial warehouses. | |
TE-BAS-0623-00049 | Approved | 06/27/2023 | N/A | -- Commercial Water Harvesting Ordinance | Site/Grading: Tucson Commerce Center (NORTH side of Rodeo Wash). Three industrial warehouses. | |
TE-BAS-0723-00089 | Active | 07/19/2023 | N/A | -- Stormwater Basin | Basin B1, Southwest corner of site | |
TE-BAS-0723-00090 | Active | 07/19/2023 | N/A | -- Stormwater Basin | Basin B2, Northwest side of lot, stretches along the west and north sides | |
TE-BAS-0723-00091 | Active | 07/19/2023 | N/A | -- Stormwater Basin | Basin B3, North side of site, East of TE-BAS-0723-00090, between the western and middle driveway entrance | |
TE-BAS-0723-00092 | Active | 07/19/2023 | N/A | -- Stormwater Basin | Basin B4, North and Northeast corner of site, East of TE-BAS-0723-00091, between right and middle driveway entrance | |
T22PRE0027 | CLOSED | 02/11/2022 | N/A | NEIGHBORHOOD NOTIFICATION -- LABELS | Site/Grading/Swppp/Floodplain: Tucson Commerce Center. Three industrial warehouses. |
Record Requests
Address: 3780 E VALENCIA RD
Date - 11/13/2024 4:14 a.m.
Total Number Of Requests - (8)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0824-05497 | Complete | 08/14/2024 | 08/16/2024 | Requests | TC-COM-0224-00259 New meter, associated with TC-COM-0124-00106. Additional permit required per JG |
REQ-0924-06152 | Complete | 09/12/2024 | 09/12/2024 | Requests | Free Standing Rack - CofO |
REQ-1024-06753 | Denied | 10/04/2024 | N/A | Requests | This project is not complete all inspections need to be approved AND all conditions need to be satisfied. Please re-request once all items have been completed. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |
REQ-1024-06901 | Denied | 10/10/2024 | N/A | Requests | This Project is not complete all conditions need to be satisfied. Once documents are submitted and all Reviews/Revision are approved, and conditions are satisfied re-request for CofO/LOC. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |
REQ-1024-07011 | Denied | 10/15/2024 | N/A | Requests | This Project is not completed all conditions need to be satisfied and documentation needs to be provided. If on expansion anchors and the welding conditions either were not used submit a letter from the engineer to this effect, seal/sign/dated and submit it. Please re-request once all conditions have been satisfied and review is complete. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |
REQ-1024-07084 | Complete | 10/17/2024 | 10/17/2024 | Requests | PLEASE REQUEST FUTURE C OF O EXTENSIONS UNDER THIS REQUEST TC-CFO-0924-00198. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |
REQ-1024-07128 | Complete | 10/21/2024 | 10/22/2024 | Requests | Requesting Letter of Completion for Conveyor Belt installation permit #TC-COM-0424-00570 |
REQ-1024-07233 | Complete | 10/23/2024 | 10/23/2024 | Requests | THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE |