Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel14041124E
14041124C
140411250
JurisdictionTucson
City of Tucson ZoningI-1
Water Course

Washes

Tucson WardWard 5
Major Streets & Routes

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 3780 E VALENCIA RD
Date - 11/13/2024 4:14 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-88-01 Country Club - Valencia 7025 7090

Rezoning Cases

Date - 11/13/2024 4:14 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-03-19 Jacome - Valencia Road and Alv C-1 Expired 05/17/2006

Permits

Address: 3780 E VALENCIA RD
Date - 11/13/2024 4:14 a.m.
Total Number Of Permits - (36)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-1222-00335 Issued 12/20/2022 06/18/2023 Commercial Building Providing temporary power to a construction site using a 400AMP single phase 240V system via overhead wire.
TF-FCP-1222-00216 Complete 12/20/2022 12/17/2023 Fire Construction Permit Provide 8 complete wet-pipe sprinkler system and 1,500 GPM electric fire pump
TC-CFO-1124-00224 Complete 11/07/2024 N/A UNIT 110 Certificate of Occupancy PLEASE PAY TCO EXTENSION UNDER TC-CFO-1024-00212. WHEN REQUESTING PLEASE DO NOT START A NEW REQUEST. IF ANOTHER EXTENSION IS NEEDED REQUEST EXTENSION UNDER TC-CFO-1024-00212 a tenant finish for an existing one story single sided dock warehouse / distribution building
TC-CFO-1024-00212 Fees Paid 10/15/2024 11/15/2024 UNIT 110 Certificate of Occupancy a tenant finish for an existing one story single sided dock warehouse / distribution building
TZ-CMP-1023-00188 Complete 10/10/2023 N/A Zoning Compliance Applicant is is currently constructing its redevelopment of the subject property to include over 700,000 square feet of new Class A industrial development (the “Project”). The Project consists of three industrial buildings which are expected to attract a wide range of industrial, technology, manufacturing and logistics companies. Please note we would like this letter to contain affirmative language stating the following: 1. That the Property is located within the I-1 (Light Industrial) zoning classification; 2. The permitted uses thereunder, with specific confirmation that the use of the Property and structures located thereon (if any) is allowed under the current zoning; 3. That there is compliance with respect to (as applicable): a. Area, width, and depth of the land as a building site for the structures; b. Floor space area for the structures; c. Setback of said structure from property lines; d. Height of said structures; and e. Sufficient parking spaces. 4. That all conditions have been satisfied and an occupancy permit has been issued (if applicable); 5. That the Property is in compliance with all applicable subdivision, ordinances and regulations; and 6. Permitted uses under the current zoning, without the necessity of obtaining a rezoning, conditional use permit or variance, includes, but is not limited to: a. Receiving, storing, assembling, shipping, distributing, preparing, and selling products, materials, food, grocery and liquor items; b. The parking (including tandem parking), storage, and use (including driving into and through the building for loading and unloading and parking inside the building) of automobiles, trucks, machinery and trailers, including outdoor loading and unloading; c. Warehouse and office use; d. Using, handling or storing hazardous materials in accordance with applicable law and in the ordinary course of business, including (i) in any packaged merchandise to be sold, handled, and/or held for shipment to customers, (ii) maintenance of trucks and machinery, and (iii) batteries for any trucks, generators or other machinery or the equipment described in clause (e); e. Installing and operating rooftop equipment such as satellite dishes, cellular antenna, and renewable energy systems, including solar energy systems and related equipment; f. Installing and operating battery storage systems, and electrical generators; and g. Ancillary and related uses for any of the foregoing, all on a twenty-four-hour, seven-days-per-week, fifty-two-weeks-per-year basis.
TC-CFO-1024-00210 Denied 10/09/2024 N/A UNIT 110 Certificate of Occupancy This project still needs the okay from Fire inspector and level for Temporary Certificate of Occupancy. Please schedule Fire Final. Once you get the okay from Fire inspector please re-request Temporary Certificate of Occupancy. a tenant finish for an existing one story single sided dock warehouse / distribution building
TC-COM-1023-02375 Complete 10/09/2023 04/20/2025 UNIT 190 Commercial Building THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
TC-CFO-0924-00198 Issued 09/13/2024 11/20/2024 UNIT 190 Certificate of Occupancy PLEASE REQUEST FUTURE C OF O EXTENSIONS UNDER THIS REQUEST TC-CFO-0924-00198. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
TC-CFO-0824-00183 Complete 08/29/2024 10/20/2024 UNIT 190 Certificate of Occupancy THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
TF-FCP-0824-00725 Void 08/29/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0424-00328 - Install New Line for protection of warehouse conveyor.
TF-FCP-0824-00727 Void 08/29/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0424-00328 - Install New Line for protection of warehouse conveyor
TD-DEV-0824-00237 Inspections Complete 08/19/2024 10/11/2027 Development Package Site development package related to TI permit # TC-COM-1023-02375. This package covers the modifications to the site including adding some prefabricated ramps, smokers, shelter, paint markings / graphics, and site signage throughout.
TC-CFO-0824-00171 Complete 08/16/2024 10/20/2024 UNIT 190 Certificate of Occupancy THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
TF-FCP-0724-00597 Inspections 07/24/2024 02/14/2025 UNIT 110 Fire Construction Permit fire sprinkler TI and mezzanine
TF-FOP-0724-00792 Complete 07/17/2024 10/01/2025 UNIT 110 Fire Operational Permit Racking High Piled Storage Permit
TF-FCP-0724-00551 Complete 07/11/2024 02/06/2025 UNIT 110 Fire Construction Permit New fire alarm system.
TS-PRM-0724-00316 Issued 07/11/2024 01/07/2025 UNIT 110 Sign - Permanent Install one lighted wall sign
TF-FCP-0724-00543 Complete 07/09/2024 01/18/2025 Fire Construction Permit EXPEDITE - ERRCS System
TF-FCP-0724-00547 Void 07/09/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0724-00543 - ERRCS SYstem
T22CM04001 Complete 05/25/2022 07/14/2024 Commercial Building Shell Bldg.
TF-FCP-0524-00357 Complete 05/07/2024 11/14/2024 Fire Construction Permit Expedite. New Fire Alarm.
TF-FCP-0523-00671 Complete 05/05/2023 N/A Fire Construction Permit New underground fire line service into 259,274 sqft warehouse building
TC-COM-0424-00755 Complete 04/30/2024 03/09/2025 UNIT 190 Commercial Building Free Standing Rack
TF-FCP-0424-00328 Complete 04/25/2024 05/21/2025 Fire Construction Permit DOUBLE EXPEDITE - MODIFY FIRE SPRINKLER SYSTEM IN WAREHOUSE TO NEW OFFICE AND TO DRY CANOPY.
DP22-0100 Complete 04/21/2022 06/24/2027 Development Package Site/Grading: Tucson Commerce Center (NORTH side of Rodeo Wash). Three industrial warehouses.
TC-COM-0424-00570 Complete 04/01/2024 03/31/2025 Commercial Building conveyor belt plans with electrical connections for electrical permit
TR-UTL-0324-00614 Issued 03/26/2024 05/17/2024 Right-of-Way (ROW) - Utility P.208268 - Access of ex MH 18211 for splicing, replace (1) TR-UTL-1123-02870 Ped, place (1) new HH, dig (2) pits and bore 437' -- (Continuation of Expired 1/16/2024 - Permit TR-UTL-1123-02870)
TC-COM-0324-00430 Issued 03/08/2024 04/19/2025 UNIT 110 Commercial Building a tenant finish for an existing one story single sided dock warehouse / distribution building
TC-COM-0224-00259 Issued 02/08/2024 02/16/2025 Commercial Building New meter, associated with TC-COM-0124-00106. Additional permit required per JG
TC-CFO-0124-00025 Complete 01/18/2024 03/02/2024 Certificate of Occupancy new construction for a 1 story warehouse distribution building.
TC-COM-0124-00106 Issued 01/17/2024 03/26/2025 Commercial Building New TEP transformer and a 4000amp SES install and East electrical service relocate
T16RW00311 FINAL 07/05/2016 12/12/2016 ROW INSTALLATION OF NEW HAWK CROSSWALK ALONG WITH 4 NEW HANDICAP RAMPS AT EACH CORNER OF INTERSECTION, ALL PER U-2015-018
T16RW02794 EXPIRED 11/17/2016 12/16/2016 ROW ACCESSING MANHOLES; SEWER REHABILITATION NO EXCAVATION ADDRESS ON APPLICATION: 3556 E VALENCIA
T18RW02426 FINAL 05/30/2018 06/29/2018 ROW N.345029 - PART TWO WORK SCOPE: CENTURYLINK REQUESTS PERMISSION TO ACCESS MANHOLE #18916 FOR FIBER OPTIC, BORE AND PLACE HAND HOLE.
T18RW02654 FINAL 06/13/2018 07/25/2018 ROW TEP TO REPLACE POLE, NO SIDEWALK
T18RW04458 FINAL 10/03/2018 04/14/2019 ROW WO 6228030 TEP TO REPLACE POLE, NO SIDEWALK

Plans

Address: 3780 E VALENCIA RD
Date - 11/13/2024 4:14 a.m.
Total Number Of Plans - (7)
Plan Number Status Application Date Exp Date Unit Type Description
CWH-22-0100 Active 04/21/2022 04/21/2023 -- Commercial Water Harvesting Ordinance Site/Grading: Tucson Commerce Center (NORTH side of Rodeo Wash). Three industrial warehouses.
TE-BAS-0623-00049 Approved 06/27/2023 N/A -- Commercial Water Harvesting Ordinance Site/Grading: Tucson Commerce Center (NORTH side of Rodeo Wash). Three industrial warehouses.
TE-BAS-0723-00089 Active 07/19/2023 N/A -- Stormwater Basin Basin B1, Southwest corner of site
TE-BAS-0723-00090 Active 07/19/2023 N/A -- Stormwater Basin Basin B2, Northwest side of lot, stretches along the west and north sides
TE-BAS-0723-00091 Active 07/19/2023 N/A -- Stormwater Basin Basin B3, North side of site, East of TE-BAS-0723-00090, between the western and middle driveway entrance
TE-BAS-0723-00092 Active 07/19/2023 N/A -- Stormwater Basin Basin B4, North and Northeast corner of site, East of TE-BAS-0723-00091, between right and middle driveway entrance
T22PRE0027 CLOSED 02/11/2022 N/A NEIGHBORHOOD NOTIFICATION -- LABELS Site/Grading/Swppp/Floodplain: Tucson Commerce Center. Three industrial warehouses.

Record Requests

Address: 3780 E VALENCIA RD
Date - 11/13/2024 4:14 a.m.
Total Number Of Requests - (8)
Request Number Status Request Date Completed Date Type Description
REQ-0824-05497 Complete 08/14/2024 08/16/2024 Requests TC-COM-0224-00259 New meter, associated with TC-COM-0124-00106. Additional permit required per JG
REQ-0924-06152 Complete 09/12/2024 09/12/2024 Requests Free Standing Rack - CofO
REQ-1024-06753 Denied 10/04/2024 N/A Requests This project is not complete all inspections need to be approved AND all conditions need to be satisfied. Please re-request once all items have been completed. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
REQ-1024-06901 Denied 10/10/2024 N/A Requests This Project is not complete all conditions need to be satisfied. Once documents are submitted and all Reviews/Revision are approved, and conditions are satisfied re-request for CofO/LOC. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
REQ-1024-07011 Denied 10/15/2024 N/A Requests This Project is not completed all conditions need to be satisfied and documentation needs to be provided. If on expansion anchors and the welding conditions either were not used submit a letter from the engineer to this effect, seal/sign/dated and submit it. Please re-request once all conditions have been satisfied and review is complete. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
REQ-1024-07084 Complete 10/17/2024 10/17/2024 Requests PLEASE REQUEST FUTURE C OF O EXTENSIONS UNDER THIS REQUEST TC-CFO-0924-00198. THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE
REQ-1024-07128 Complete 10/21/2024 10/22/2024 Requests Requesting Letter of Completion for Conveyor Belt installation permit #TC-COM-0424-00570
REQ-1024-07233 Complete 10/23/2024 10/23/2024 Requests THE PROJECT CONSISTS OF AN EXISTING BUILDING WHICH WILL BE SEPARATED INTO TWO TENANT SPACES. SCOPE OF WORK INCLUDES THE TENANT FIT OUT OF ONE SIDE OF THE BUILDING. THE EXTENT OF CONSTRUCTION WITHIN THE NEW TENANT SPACE WILL INCLUDE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, AND ELECTRICAL ELEMENTS TO ACCOMMODATE THE TENANT IMPROVEMENT SCOPE HEREIN. A NEW ROBOTIC COMPONENT IS BEING ADDED WHICH CONSISTS OF FENCING AROUND THE PERIMETER OF THE ROBOTIC FIELD WITH WORKSTATIONS LOCATED ALONG ONE SIDE. NO EMPLOYEE WORKSTATIONS ARE LOCATED WITHIN THE FIELD. ACCESS GATES ARE PROVIDED ALONG THE PERIMETER TO ALLOW SERVICING BY MAINTENANCE PERSONNEL. NO NEW SQUARE FOOTAGE IS BEING ADDED AND THERE IS NO PROPOSED CHANGE IN USE