Inspection Status: Not Ready

Inspection History: COT - HCBU - Preslab  

Date Description Inspector Results Comments
07/01/2024 COT - HCBU - Preslab   Not Ready 7/1/24: not ready
07/02/2024 COT - HCBU - Preslab   Partial Pass 7/1/24: not ready
7/2/24: reinforcement per plan at pour back at rooms (130,131,132,133,134), elevator concrete wall reinforced per plan ok to proceed.
07/26/2024 COT - HCBU - Preslab   Partial Pass 7/26/2024 : reinforcement per plan at underground for reception desk, Sand separator and Mezzanine main office bathrooms. Okay for concrete placement.
08/12/2024 COT - HCBU - Preslab   Partial Pass 8/12/2024 mezzanine decking reinforcement per plan. Okay for concrete placement in slab.
08/14/2024 COT - HCBU - Preslab   Partial Pass Footings for columns: grid line A4/18C, A1/18C, A5/18C, A/17D. Beam bearing at tilt up wall. Grid line A/18A. Approved per special inspection. (Third party) 8/14/2024
09/16/2024 COT - HCBU - Preslab   Passed