Permit: T22CM04922
Permit Details
Apply Date:
06/29/2022
Applicant:
Description:
New Mixed Use building with Apartment & Retail
Permit Reviews
Permit Number - T22CM04922
Permit Status: Issued
Permit Description: New Mixed Use building with Apartment & Retail
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/29/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 09/06/2022 | COMPLETED |
09/16/2022 | RESUBMITTAL | 10/11/2022 | ACTIVE |
02/05/2024 | RESTAMP - COMMERCIAL v.1 | 02/06/2024 | APPROVED |
03/17/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/29/2023 | APPROVED |
05/24/2024 | COMMERCIAL REVIEW - FULL v.1 | 05/24/2024 | REQUIRES RESUBMIT |
11/03/2022 | COMMERCIAL REVIEW - FULL v.1 | 11/22/2022 | REQUIRES RESUBMIT |
12/06/2022 | COMMERCIAL REVIEW - FULL v.2 | 01/09/2023 | REQUIRES RESUBMIT |
07/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/25/2024 | APPROVED |
04/12/2023 | COMMERCIAL REVIEW - FULL v.1 | 04/18/2023 | APPROVED |
12/14/2023 | COMMERCIAL REVIEW - FULL v.2 | 01/11/2024 | REQUIRES RESUBMIT |
05/28/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/28/2024 | REQUIRES RESUBMIT |
02/02/2023 | COMMERCIAL REVIEW - FULL v.1 | 02/02/2023 | REQUIRES RESUBMIT |
09/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2024 | APPROVED |
09/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 09/23/2024 | APPROVED |
08/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/20/2024 | REQUIRES RESUBMIT |
07/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/04/2023 | APPROVED |
07/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/24/2024 | REQUIRES RESUBMIT |
06/28/2024 | COMMERCIAL REVIEW - FULL v.3 | 07/01/2024 | APPROVED |
02/02/2023 | COMMERCIAL REVIEW - FULL v.1 | 02/02/2023 | APPROVED |
10/02/2024 | COMMERCIAL REVIEW - FULL REVISION v.1 | 10/29/2024 | APPROVED |
01/30/2023 | COMMERCIAL REVIEW - FULL v.3 | 02/02/2023 | REQUIRES RESUBMIT |
10/23/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/23/2023 | REQUIRES RESUBMIT |
02/01/2024 | COMMERCIAL REVIEW - FULL v.3 | 02/05/2024 | APPROVED |
09/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/13/2024 | REQUIRES RESUBMIT |
02/16/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/09/2023 | APPROVED |
Conditions
Permit Number - T22CM04922
Permit Status: Issued
Permit Description: New Mixed Use building with Apartment & Retail
Date | Description | Comments |
---|---|---|
07/18/2024 | AIR BALANCING REPORT IS REQUIRED. | |
09/23/2024 | COMMISSIONING REPORT IS REQUIRED. | |
09/23/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
01/03/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
07/18/2024 | SPECIAL ISNEPCTION IS REQ'D FOR AN ELEVATION CERTIFICATE. THE LEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. | |
07/18/2024 | Elevator Designs must be submitted and approved prior to ... | |
09/23/2024 | ELEVATOR INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
09/23/2024 | Masonry Inspection Report submittal review is required. | |
07/18/2024 | 2 way communication Designs must be submitted and approved prior to final ... | |
07/18/2024 | Co systems Designs must be submitted and approved prior to ... | |
07/18/2024 | Curtainwall Designs must be submitted and approved prior to ... | |
07/18/2024 | Generator Designs must be submitted and approved prior to ... | |
09/23/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
09/23/2024 | Post-Installed Anchor Inspection Report is required. | |
07/18/2024 | Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit. | |
10/01/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
07/18/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
09/23/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
09/23/2024 | Spray Applied Fireproofing | |
09/23/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04922
Permite Description: New Mixed Use building with Apartment & Retail
Total Outstanding Inspections - 13
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2023 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | Level #9, Batches A & B. OK to cover exterior walls. Sheetrock nailing at Level #4, Batch ; C, rooms 425, 427, 428, 429, 430, 431, 432. Domestic water lines on Level #6, rooms 617, 618, 619, 620, 621, 622, 623, Ok to tape rooms throughout. |
11/13/2023 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Level #5, corridors above ceiling |
10/31/2023 | COT - HCBU - Framing | N/A | Partial Pass | Sheetrock nailing on Level #6, rooms 625, 626, 627, 628, 629. |
12/05/2023 | COT - HCBU - Interior Shear Bracing | N/A | Canceled | Level #8, Sheetrock nailing in rooms: 811, 810, 808, 806, 805, 804. Ok to tape progress areas. Level #9, domestic water lines in rooms 923, 026, 925, 927, 928, 929, 939, 931, 932. |
04/20/2023 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | CMU walls at GL: N - Q/7, 10.6 - 8/N - Q at 12 feet AFFE. OK to place grout in progress areas. Level #4 columns at GL: B.1/8, 7/A, 6/A, 6/B, 6/C. OK to set forms and place concrete. |
12/08/2023 | COT - HCBU - Roof Nailing | N/A | Partial Pass | Information only: scheduling inspections for above ceilings, MEP, exterior sheathing. |
11/27/2023 | COT - HCEL - Electrical Progress | N/A | Partial Pass | Sheet rock nailing for room units on Level #7, Area C: 723, 725, 726, 727, 728, 729, 731, 732. Ok to tape and texture progress areas. |
08/28/2023 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | Level #4; Batch C: Rooms 427, 428, 423, 425, 426, 430, 432, 431. Batch A rooms 401, 402, 403, 404, 405, 406, 407, 408, 410, 411. |
02/07/2024 | COT - HCPL - Plumbing Progress | N/A | Not Ready | Contractor cancelled, will reschedule for 8 February. |
08/09/2023 | COT - HCME - Mechanical Above Ceiling | N/A | Partial Pass | Batch A rooms at 310, 307, 305, 304, 301, 302, 303, 306, 308, 311. |
09/26/2023 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Mechanical, Electrical, Plumbing in rooms on Level #5; Bat h B. Building progress: Level #14, place #3: Post Tension Cable system. Ok to place concrete in progress areas. |
09/22/2023 | COT - HCME - Mechanical Progress | N/A | Partial Pass | 9/22/23: Fire and Smoke Dampers on level 3 per plan, |
07/18/2024 | COT - HCBU - Building Final | N/A | Partial Pass | Level #3, close-out room inspections at #301 -327. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04922
Permit Description: New Mixed Use building with Apartment & Retail
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/23/2024 | COT - HCPL - Gas Final | Passed | Gas line from ground level to roof area for equipment; 1” line to amenities area . Submitted for gas clearance to install a gas meter. | |
07/24/2024 | COT - HCBU - Building Progress | Passed | Lightening protection system complete; terminated in level #1 electric room | |
07/25/2024 | COT - FCON - Alarm - Final | Passed | ||
07/25/2024 | FCON – Fire – Intermediate | Passed | ||
07/25/2024 | COT - HCBU - TCO | Passed | Ok to make application for Temporary Certificate of Occupancy; Level #4. Building will not be occupied until 15 August | |
08/01/2024 | BULD - Electrical Clearance | Passed | No clearance required; service is active. | |
08/01/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
08/01/2024 | COT - HCBU - Framing | Passed | ||
08/01/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/01/2024 | COT - HCBU - Masonry Pregrout | Passed | ||
08/01/2024 | COT - HCBU - Roof Nailing | Passed | ||
08/01/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
08/01/2024 | COT - HCEL - Electrical Progress | Passed | ||
08/01/2024 | COT - HCEL - Electrical Underground | Passed | ||
08/01/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
08/01/2024 | COT - HCPL - Plumbing Progress | Passed | ||
08/01/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
08/01/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
08/01/2024 | COT - HCME - Mechanical Progress | Passed | ||
08/15/2024 | COT - HCBU - Building Final | Passed | Ok to make application for Certificate of Occupancy; pending Fire Final. | |
09/25/2024 | COT - FCON - Fire - Final | Passed | ||
09/25/2024 | COT - FCON - Sprinkler - Final | Passed |