Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCME - Mechanical Progress
Permit Number - T22CM04922
Inspection Description - COT - HCME - Mechanical Progress
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2024 | COT - HCME - Mechanical Progress | Passed | ||
08/14/2023 | COT - HCME - Mechanical Progress | Partial Pass | Level #3, Batch B Mechanical duct works and heating/cooling unit in place. Additional inspections are for building progress at: vertical columns at Level #11 at GL: L/6, L/7, M/6, M/7, M.3/6.2, N/7.3, N/8. OK to set forms and place concrete. Level #11 placement #4 on post tension cable system. | |
08/28/2023 | COT - HCME - Mechanical Progress | Partial Pass | Level #4’ Batch C rooms 427, 428, 423, 425, 426, 430, 432, 431. Batch A, rooms 401, 402, 403, 404, 405, 406, 407, 408, 410 411. | |
09/12/2023 | COT - HCME - Mechanical Progress | Partial Pass | Level #4, Area C, Mechanical, Plumbing, Electric in rooms 426, 425, 427, 428, 429, 430, 431, 432. Ok to insulate and Sheetrock walls. Level #4, Area A, Sheetrock nailing in room units. Ok to,tape,throughout. |
|
09/22/2023 | COT - HCME - Mechanical Progress | Partial Pass | 9/22/23: Fire and Smoke Dampers on level 3 per plan, |